35
3. MAKEREADY
red
3.15 Indication at the discharge of test objects
Important:
Have attention to chapter 2.14 and 2.15.
If the test voltage is off, the test object is discharged by the tester au-
tomaticly. The integrated residual voltage detection is monitoring the
discharge process. If the residual voltage under-runs 60 V, the discharge
process is finished.
As long as the discharge process is
active, the red button "RESET" and the
red lamp of warning-set is active. The
digital output HV-ON (X7 pin 9) is hold-
ing "high".
Combi-tester G7-1G/-1H/-1T/-1U
3.14 SAFETY CIRCUITS SK1 and SK2
The high voltage device is equipped with two safety circuits. Op-
eration with a second safety circuit increases the safety on test
systems with guards.
ONLY AN ELECTRICIAN IS ALLOWED TO WORK ON THE SAFETY
CIRCUIT, WITH THE DEVICE ELECTRICALLY ISOLATED FROM THE
MAINS (UNPLUG FROM THE MAINS SOCKET).
Attention:
Faulty safety circuits are only allowed to be repaired by an electrician with
appropriate skills.
Attention:
The managerial staff must ensure the safety circuit works correctly, on
site, immediately after the completion of the repair.
Note:
SK1 is closed by connecting to Ue
SK2 is closed by connecting to GND
On this topic see chapter „Digital interface X7“
3.14.1
Fault in the device‘s safety circuit
Important:
If a malfunction is found in the safety circuit incorporated in
the device, testing must be interrupted immediately. No further tests are
allowed. The device must be sent to ELABO for repair without delay.
Summary of Contents for G7-1G
Page 5: ...5 1 INTRODUCTION free page Combi tester G7 1G 1H 1T 1U...
Page 38: ...38 4 Operating modes 4 2 Normal Mode Test sequence Combi tester G7 1G 1H 1T 1U...
Page 39: ...39 4 Operating modes 4 2 1 HV IS test normal mode Combi tester G7 1G 1H 1T 1U...
Page 40: ...40 4 Operating modes 4 2 2 PE test normal mode Combi tester G7 1G 1H 1T 1U...
Page 41: ...41 4 Operating modes 4 2 3 Normal mode input step Combi tester G7 1G 1H 1T 1U...
Page 42: ...42 4 Operating modes 4 2 4 Normal mode output step Combi tester G7 1G 1H 1T 1U...
Page 43: ...43 4 Operating modes 4 2 4 Normal mode time step Combi tester G7 1G 1H 1T 1U...
Page 44: ...44 4 Operating modes 4 3 Fast Start Mode test sequence Combi tester G7 1G 1H 1T 1U...
Page 45: ...45 4 Operating modes 4 3 1 Fast Start Mode PE HV ISO Test Combi tester G7 1G 1H 1T 1U...