INSTALLATION
NP-DK50-Nx2VTM-AD-EN-6_04-2022
30
04/2022
Fig. 17: Connecting the electrical cables
Connect
the
disconnected
electrical cables (E) to the
terminal strips in the electric
motor boxes. Insert the cables
into the electrical installation
trays and enclose with a cover.
Fig. 18: Connecting the power cord
Connect the TN-S mains to the power
supply terminal in the equipment’s
junction box (F). Connect the electrical
components to the mains in accordance
with the valid electrical standards and
regional regulations.
Fig. 19: Connecting the cable to the pressure switch
Connect the loose cord to the pressure
switch per the schematic, or Fig. 19,
tighten the screws and secure with paint
Summary of Contents for DK50 4x2VT/M
Page 1: ...DK50 4x2VT M DK50 6x2VT M User manual...
Page 2: ......
Page 10: ...PRODUCT DESCRIPTION NP DK50 Nx2VTM AD EN 6_04 2022 10 04 2022 DK 50 6x2VT M...
Page 14: ...PRODUCT DESCRIPTION NP DK50 Nx2VTM AD EN 6_04 2022 14 04 2022 Fig 2 Adsorption dryer...
Page 32: ...INSTALLATION NP DK50 Nx2VTM AD EN 6_04 2022 32 04 2022 15 PNEUMATIC DIAGRAMS DK50 4x2VT M...
Page 33: ...INSTALLATION 04 2022 33 NP DK50 Nx2VTM AD EN 6_04 2022 DK50 6x2VT M...
Page 58: ......
Page 59: ......