INSTALLATION
04/2022
23
NP-DK50-Nx2VTM-AD-EN-6_04-2022
You may notice a “new
product” odour when you first
place the product into service
(for a short period of time). This
odour is temporary and does
not impede the normal use of
the product. Ensure the space
is properly ventilated after
installation.
Fig. 4: Equipment installation
11. COMPRESSOR ASSEMBLY
11.1. Handling and releasing the
compressor
Unpack the compressor (compressor
modules, dryer and air tank) from the
packaging and remove the transport
anchors from the pallet. All modules
are secured to pallets.
Use a fork lift or similar hoisting
equipment to handle and position the
product.
Position the compressor module at the
site of installation. (Fig. 5)
Air outlet
Space conditions
-
Tempe5°C
÷
+40°C
-
Relative humidity 70%
Recommended flow
of cooling air:
DK50 6x2VT/M - 1500m
3
/h
DK50 4x2VT/M
– 1000m
3
/h
Applies for continuous
operation and cooling air
temperature of
20°C
Cooling air inlet
Summary of Contents for DK50 4x2VT/M
Page 1: ...DK50 4x2VT M DK50 6x2VT M User manual...
Page 2: ......
Page 10: ...PRODUCT DESCRIPTION NP DK50 Nx2VTM AD EN 6_04 2022 10 04 2022 DK 50 6x2VT M...
Page 14: ...PRODUCT DESCRIPTION NP DK50 Nx2VTM AD EN 6_04 2022 14 04 2022 Fig 2 Adsorption dryer...
Page 32: ...INSTALLATION NP DK50 Nx2VTM AD EN 6_04 2022 32 04 2022 15 PNEUMATIC DIAGRAMS DK50 4x2VT M...
Page 33: ...INSTALLATION 04 2022 33 NP DK50 Nx2VTM AD EN 6_04 2022 DK50 6x2VT M...
Page 58: ......
Page 59: ......