Firmware V6.6.9
29.07.2020
17/147
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
4 System centre functions
4.1 Tasks and functions
Functions starting with CI 4000 and higher
Central parametrisation and configuration of all E*LDS components via the CAN bus / Modbus:
all E*LDS components can be operated and configured remotely via the controller (see operating manual
"Basics and general security and connection instructions").
Central display of operating data, 24h lists, messages and alarms of all E*LDS components.
Central and system-wide change of the user language during running operation.
Monitoring of the CAN bus / Modbus and the operational readiness of all E*LDS components:
appropriate alarms are generated in the event of faults and failure of the CAN bus / Modbus or failure of
E*LDS components.
Monitoring of external alarms and logging of meters via the two digital inputs or of up to 12 digital inputs
using a SIOX extension module.
Remote alarm signalling of the E*LDS system, alarm is signalled to fault indicator centre using modem,
GSM, SMS, FAX and network.
Alarm is signalled of alarms and messages of the controller and of the E*LDS system:
via two alarm contacts Prio 1 / Prio 2,
via audible internal signal generator (buzzer),
Via optional configurable multifunction relay AUX (parameter “Horn”) and
Alarm signalling by flashing the touchscreen when screensaver is activated.
Control of up to 8 relay outputs of a SIOX extension module using week timers.
Central time synchronisation (time server):
The date and time can be adjusted system-wide using the controller. It also cyclically synchronises the
internal clocks of all E*LDS components via the CAN bus. For this, the system centre has a real-time clock
with power reserve that supports the automatic changeover between summer and winter time.
Energy management:
Electricity, water, gas, heat and event meters with pulse output (S0), can be connected or also M-bus
meters using the M-bus gateway. The controller determines and archives the current output or the
throughput and the daily energy requirement or consumption.
Load shedding manager (LAM ):
The Load Shedding Manager can be configured for up to 20 shedding points and optimises the power
consumption of the installation / building control system within a load optimising interval of 15 minutes.
Remote maintenance of the installation / store via a central computer (PC) with the PC software LDSWin.