4-26
Coupling
Circuits
(4)
The working voltage rating of R1 may be achieved by using two 470k
Ω
resistors in series, each with a working
voltage rating of at least half of the value listed above. In addition, the peak power and peak voltage rating of R1
must be chosen to meet the high-pot testing requirements of the application.
(5) High-pot manufacturing tests must be performed proir to installation of this gas discharge tube. High-pot testing
between line and earth is usually performed at voltages above the gas tube arc-over voltage, and the test will fail if
the gas tube arcs during testing. In addition, a DC high-pot tester must be used to avoid excessive current flow
through C1.
Summary of Contents for LONWORKS PLT-22
Page 6: ...iv Echelon...
Page 14: ...1 8 Introduction...
Page 67: ...LONWORKS PLT 22 Transceiver s User Guide 5 7 Figure 5 3 Capacitor Input Power Supply Schematic...
Page 92: ...6 10 Design and Test for Electromagnetic Compatibility...
Page 110: ...7 18 Communication Performance Verification...
Page 114: ...8 4 References...
Page 118: ...A 4 Appendix A...