Fuel supply and connections:
Gas
Does the fuel supply system comply with local regulations?
Does the gas supply pressure comply with current standards?
Has a flexible gas pipe been fitted?
Has the gas supply been purged and leak tested?
Has the gas isolation valve been fitted 1 m from the Power Unit?
Fuel gas system:
Has the flue gas system been installed according to regulations?
Has unit been installed with EC POWER supplied flue?
If not then please provide make and specification:
Has a condensate drain been installed (or more if required)?
Has a condensate trap been fitted on riser if vertical run is greater than 5 m?
Is there suitable trap fitted to eliminate flue bypass from condensate?
Summary of Contents for XRGI 20G-TO
Page 1: ...System components Installation INSTRUCTIONS...
Page 2: ...2 Version 1 0 2012 Manual XRGI 20G TO...
Page 98: ...98 Version 1 0 2012 Manual XRGI 20G TO...
Page 131: ...131 Version 1 0 2012 Manual XRGI 20G TO...
Page 152: ...152 Version 1 0 2012 Manual XRGI 20G TO...
Page 153: ...153 Version 1 0 2012 Manual XRGI 20G TO...
Page 154: ...154 Version 1 0 2012 Manual XRGI 20G TO...
Page 155: ...155 Version 1 0 2012 Manual XRGI 20G TO...
Page 156: ...156 Version 1 0 2012 Manual XRGI 20G TO...
Page 157: ...157 Version 1 0 2012 Manual XRGI 20G TO...
Page 158: ...158 Version 1 0 2012 Manual XRGI 20G TO...
Page 159: ...159 Version 1 0 2012 Manual XRGI 20G TO...
Page 160: ...160 Version 1 0 2012 Manual XRGI 20G TO...
Page 161: ...161 Version 1 0 2012 Manual XRGI 20G TO...
Page 162: ...162 Version 1 0 2012 Manual XRGI 20G TO...
Page 166: ...166 Version 1 0 2012 Manual XRGI 20G TO Notes...
Page 167: ...167 Version 1 0 2012 Manual XRGI 20G TO...
Page 168: ......