45
Technical Data
PR202-50-502-22
Effective June 2017
CF2000 System
EATON
www.eaton.com
Operations (Lamp Test)
The
Lamp Test
screen is accessed as shown below . The
Operations
screens are accessed from the healthy screen by
first pressing any button . You will then be prompted to enter the
passcode which will show the events screen by default, press
the
Scroll Down
button until the
Lamp Test
screen is shown as
illustrated below .
Press
OK
and scroll through the list of options using the
Up
and
Down
arrow buttons and pressing
OK
to select .
Figure 24. Operations (Lamp Test) screen