Parallel System Installation Checklist
-
Each cabinet in the parallel system is placed in its installed location.
-
All conduits and cables are properly routed to the UPMs and to the parallel tie or distribution cabinet.
-
All power cables are properly sized and terminated.
-
The bypass source feeding the optional bypass of the parallel tie cabinet and the UPMs is from the same
source of supply and is a four-wire wye configuration.
-
Neutral conductors are installed or bonded to ground as per requirements.
-
A ground conductor is properly installed.
-
Computer Area Network (CAN) wiring between the UPMs is properly installed.
-
Pull chain wiring between the UPMs is properly installed.
-
Adequate workspace exists around the UPMs, parallel tie cabinet, and other cabinets.
-
Startup and operational checks are performed by an authorized Eaton Customer Service Engineer.