
1
10
−
14
EATON
Powerware 9315 Parallel Capacity/Redundant System
164201150 Rev. E
www.powerware.com
10.3.12 Resetting the Parallel Capacity/Redundant System after
EMERGENCY UPM OFF
CAUTION
Do not attempt to restart the UPM after Load Off until the cause of
the emergency has been identified and cleared.
The Emergency UPM Off
PUSH IN TO RESET
pushbutton is a small white button
on the SBM Control/Monitor Panel. The
PUSH TO RESET
pushbutton pops out
when the Emergency UPM Off pushbutton on the SBM Control/Monitor Panel is
activated.
To reset the Parallel Capacity/Redundant system:
1.
Press the Emergency UPM Off
PUSH IN TO RESET
pushbutton until it clicks
in and remains recessed.
2.
The Parallel Capacity/Redundant system is now reset. To restart the Parallel
Capacity/Redundant system, follow the procedure at the beginning of this
chapter.
Summary of Contents for 9315
Page 1: ...Powerware 9315 UPS Parallel Capacity Redundant System Installation and Operation Manual ...
Page 136: ......
Page 205: ......
Page 206: ...164201150 Rev E 164201150E ...