5
−
3
EATON
Powerware 9315 Parallel Capacity/Redundant System
164201150 Rev. E
www.powerware.com
4.
Connect RIM wiring to the terminal block using the terminations shown in
Table 5−1.
Table 5−1. RIM Wire Terminations
From RIM A
To SBM
Remarks
TB1−4
TB3−1
TWISTED WIRES (4)
1−2 TURNS PER
3 INCHES
TB1−5
TB3−2
TB1−6
TB3−3
TB1−7
TB3−4
From RIM B (if used)
To SBM
Remarks
TB1−4
TB3−5
TWISTED WIRES (4)
1−2 TURNS PER
3 INCHES
TB1−5
TB3−6
TB1−6
TB3−7
TB1−7
TB3−8
5.
Contact your local field service office for verification and testing of the RIM
and its connections prior to making connections to J1−J4.
You can order interface cables separately for connecting to the 15-Pin D-Sub
Connectors.
6.
Repeat steps 1 through 5 for each RIM you are installing.
7.
If you are installing an RMP or SCM in addition to an RIM, proceed to Chapter
4 or 6, respectively; otherwise, secure the SSBM by reversing the steps
contained in procedure To Prepare the SBM for Wiring to an RMP, RIM, SCM,
or Remote EPO" of Chapter 2.
Summary of Contents for 9315
Page 1: ...Powerware 9315 UPS Parallel Capacity Redundant System Installation and Operation Manual ...
Page 136: ......
Page 205: ......
Page 206: ...164201150 Rev E 164201150E ...