Copyright 2010 Baker Hughes Company.
English–PACE Indicators Instruction Manual | 15
Preparation
3. Operation
This section contains quick reference charts detailing all the available functions and the setup
menu.
3.1 Preparation
Make sure the electrical cables and pneumatic pipes (tubes) comply with the installation
requirements. Refer to Section
Before use do the following:
1. If necessary, do the maintenance task. Refer to Section
29.
2. For bench-top, single instrument operation do the following:
a. Connect the instrument to the electrical supply.
b. Inspect the pneumatic hoses for damage, ingress of dirt and moisture.
3. Before use, the instrument should be tested.
4. Review and become familiar with the procedure before starting a process on a component
or system.
Note:
The touch-screen can be permanently damaged by sharp objects.
3.2 Power-up Sequence
The following sequences of operation shows the instrument display.
Note:
The following sequence is an example, the values and selections displayed depend on the
range(s) and options enabled in the instrument.
1. Set the power supply to ON.
2. The display shows the power-up sequence.
Note:
Do not touch the display screen during power-up.
3. The instrument carries out a self-test.
Note:
If the test finds a fault, the display shows an error,
see Section
5, “Testing and Fault Finding,” on page
31.
4. If the self-test is successful the system enables the touch
screen and changes to measure mode.
5. The touch screen shows the measured pressure in the
parameters selected in setup.
6. The instrument is now ready for use.
Summary of Contents for PACE1000
Page 1: ...Druck com PACE Indicators Pressure Automated Calibration Equipment Instruction Manual...
Page 2: ......
Page 10: ...Copyright 2010 Baker Hughes Company viii PACE Indicators Instruction Manual English...
Page 29: ...Copyright 2010 Baker Hughes Company English PACE Indicators Instruction Manual 19 Data Logging...
Page 75: ......