Copyright 2010 Baker Hughes Company.
English–PACE Indicators Instruction Manual | 7
Mounting Kits
2.5.2 Hydraulic Connection
Note:
Pressure connections greater than 210
bar (3000
psi) are 9/16
-
18 UNF male autoclave.
1. Switch off the power supply before connecting or disconnecting the instrument.
2. Use the applicable sealing method for all pressure connections. Refer to Section
5.
3. Isolate the hydraulic pressures and de-pressurize the pipes (tubes) before connecting or
disconnecting the instrument.
4. Make sure the user systems can be isolated and vented.
5. The hydraulic liquid must be clean, refer to specification given in the Data Sheet.
6. Connect the Unit Under Test (UUT) to the appropriate connection port.
7. Fill and bleed the UUT and connecting pipes (tubes).
2.6 Mounting Kits
2.6.1 Rack-mount Option
There must be enough space at the rear of the instrument for all the cables and pipes (tubes).
The length of the cables and pipes (tubes) must allow for the removal and installation of the
WARNING
Hydraulic liquid is dangerous. Observe relevant health and safety
precautions. Use appropriate protective barriers and eye protection.
Before applying pressure, examine all fittings and equipment for damage and
ensure that all equipment is to the correct pressure rating.
Do not exceed the maximum working pressure of the instrument.
Purge all air from the hydraulic liquid.
Do not use a sensor for gas that has been used with hydraulic liquid.
CAUTION
Do not exceed the maximum pressures stated in the appropriate
component manual for the unit under test.
Reduce pressure at a controlled rate when venting to atmosphere.
Carefully de-pressurize all pipes (tubes) to atmospheric pressure before
disconnecting and connecting to the unit under test.
Observe absolute cleanliness when using the instrument.
Severe damage can be caused if equipment connected to this instrument is
contaminated.
Connect only clean equipment to the instrument.
To avoid any contamination, an external filter is recommended.
Summary of Contents for PACE1000
Page 1: ...Druck com PACE Indicators Pressure Automated Calibration Equipment Instruction Manual...
Page 2: ......
Page 10: ...Copyright 2010 Baker Hughes Company viii PACE Indicators Instruction Manual English...
Page 29: ...Copyright 2010 Baker Hughes Company English PACE Indicators Instruction Manual 19 Data Logging...
Page 75: ......