Copyright 2010 Baker Hughes Company.
English–PACE Indicators Instruction Manual | 23
Operation and Example Procedures
Figure
3
-
2: Q Code Visualization
3.5.4 Leak Testing Option
This task, measures the leak rate over the measure dwell time.
At the start of the test, the instrument measures the test pressure of the user system. The
instrument then records the pressure change during measure dwell time.
1
Runway on Earth’s surface.
2
29.9212
inHg (1013.25
hPa) datum.
3
Sea level reference datum (adjusted).
QNE
QNH
QFE
1
2
3
Summary of Contents for PACE1000
Page 1: ...Druck com PACE Indicators Pressure Automated Calibration Equipment Instruction Manual...
Page 2: ......
Page 10: ...Copyright 2010 Baker Hughes Company viii PACE Indicators Instruction Manual English...
Page 29: ...Copyright 2010 Baker Hughes Company English PACE Indicators Instruction Manual 19 Data Logging...
Page 75: ......