51/57
More on Installation
LED behaviour Radiator Thermostat
Normal use
State
User Interaction
Left LED Centre
LED
Right
LED
Duration
Boost up
Twist the cap in the + direction
Solid for 5 seconds
Boost down
Twist the cap in the - direction
Solid for 5 seconds
Head calibration
State
User Interaction
Left
LED
Centre
LED
Right
LED
Duration
Start up
Insert the batteries
Single quick flash
Opening the valve
Automatic upon inserting batteries OR
Twist and hold the cap in + direction for 8 seconds
(for changing batteries)
Solid until the valve is open
Ready to install on
the valve
The radiator thermostat is ready to install when the
valve is fully open (see above)
Red and Blue: flash for up to 5 minutes
Orange solid = not joined | Green solid = joined
Closing the valve
Twist and hold the cap in the – direction for 2 seconds
Solid until the valve is closed
Joining
Twist and hold the cap in the + direction for 3 seconds
Pulses for up to 2 minutes
Join success
Solid for 5 seconds
Joining failed
If no network is found after 2 minutes
Flashes for 5 seconds
Summary of Contents for Wiser
Page 1: ...The easier smarter heating system Multi zone heating made easy User guide Set up and control ...
Page 16: ...16 57 Control your heating I need to know how to ...
Page 30: ...30 57 Wiser Room Thermostat I need to know how to ...
Page 36: ...36 57 Wiser Radiator Thermostat I need to know how to ...