Prepare - 88
JT100/JT100 All Terrain Operator’s Manual
Plan Bore Path
Recommended Bend Limits
Ditch Witch
®
drill pipes are designed to bend slightly during operation. Slight bending allows for steering
and correcting direction. Bending beyond recommended limits will cause damage that might not be visible.
This damage adds up and will later lead to sudden drill pipe failure.
Pipe Pitch
Ditch Witch drill pipe is tested to bend at a maximum
percent pitch.
•
For JT100
Power Pipe
®
HD
drill pipe, make sure
pitch (A) changes no more than
7.2%
over the full
length of each pipe.
•
For JT100
Power Pipe Forged
drill pipe, make
sure pitch (A) changes no more than
7.6%
over
the full length of each pipe.
•
For JT100
All Terrain
drill pipe, make sure pitch
(A) changes no more than
6.9%
over the full
length of each pipe.
Monitor the pitch of each pipe with the remote display on the operator’s console. (See tracking system
operation instructions.)
IMPORTANT:
Consider recommended bend limits during any bend, not just during bore entry.
NOTICE:
Bending drill pipe more sharply than recommended will damage pipe and cause failure
over time. Changes in pitch must be
equally distributed
over the length of a pipe. Maximum
changes in pitch within 1-2’ (300-600 mm) of pipe create sharp bends that will damage pipe.
Summary of Contents for JT100
Page 1: ...JT100 JT100 All Terrain Tier 4 Issue 2 1 Original Instruction Operator s Manual 053 2814...
Page 105: ...Prepare 104 JT100 JT100 All Terrain Operator s Manual...
Page 247: ...Service 246 JT100 JT100 All Terrain Operator s Manual As Needed...
Page 255: ...Service Record 254 JT100 JT100 All Terrain Operator s Manual Service Performed Date Hours...
Page 258: ......
Page 259: ......