Systems and Equipment - 146
JT100/JT100 All Terrain Operator’s Manual
Driver/Loader Attachment
Remove Pipe Box
1.
Install pipe box lift mount (1) with pipe box pin
(3). Secure with lynch pin (2). For AT box,
ensure lift mount is locked in the correct
position.
•
Position A is for full pipe box.
•
Position B is for empty pipe box.
2.
Attach loader/driver shackle to pipe box lift
mount.
3.
Install and secure pins (shown) under and
over drill pipe at each end of pipe box.
4.
Unlock and remove pin (shown) from each
end of box.
5.
Use loader/driver boom and extension
controls to lift and move one pipe box.
6.
Return loader/driver to stow position and secure with stow strap before transporting.
NOTICE:
•
Lift only one pipe box at a time.
•
Before lifting, always inspect all lifting accessories, including pins, for cracks, bending or other signs
of wear. If worn or damaged, do not use. See your Ditch Witch
®
dealer for replacement parts.
NOTICE:
•
When lifting a heavy load, do not
operate loader/driver extension and
lift controls simultaneously. Operate
one at a time and at very slow
speeds.
•
When lifting fully-loaded AT pipe box,
remember that its weight will limit
loader/driver reach. See page 18 for
load chart capacities and “All Terrain
Pipe” on page 248 for pipe box
weight.
Summary of Contents for JT100
Page 1: ...JT100 JT100 All Terrain Tier 4 Issue 2 1 Original Instruction Operator s Manual 053 2814...
Page 105: ...Prepare 104 JT100 JT100 All Terrain Operator s Manual...
Page 247: ...Service 246 JT100 JT100 All Terrain Operator s Manual As Needed...
Page 255: ...Service Record 254 JT100 JT100 All Terrain Operator s Manual Service Performed Date Hours...
Page 258: ......
Page 259: ......