JT100/JT100 All Terrain Operator’s Manual
Prepare - 81
Gather Information
Gather Information
A successful job begins before the bore. The first step in planning is reviewing information already
available about the job and jobsite.
Review Job Plan
Review blueprints or other plans and make sure you have taken bore enlargement during backreaming
and pullback into account. Check for information about existing or planned structures, elevations, or
proposed work that may be taking place at the same time.
Notify One-Call Services
Mark proposed path with white paint and have underground utilities located before working.
•
In the US or Canada, call 811 (US) or 888-258-0808 (US and Canada). Also contact any local utilities
that do not participate in the One-Call service.
•
In countries that do not have a One-Call service, contact all local utility companies to have
underground utilities located.
Examine Pullback Material
Ask for a sample of the material you will be pulling back. Check its weight and stiffness. Contact the
manufacturer for bend radius information. Check that you have appropriate pullback devices.
Arrange for Traffic Control
If working near a road or other traffic area, contact local authorities about safety procedures and
regulations.
Plan for Emergency Services
Have the telephone numbers for local emergency and medical facilities on hand. Check that you will have
access to a telephone.
Summary of Contents for JT100
Page 1: ...JT100 JT100 All Terrain Tier 4 Issue 2 1 Original Instruction Operator s Manual 053 2814...
Page 105: ...Prepare 104 JT100 JT100 All Terrain Operator s Manual...
Page 247: ...Service 246 JT100 JT100 All Terrain Operator s Manual As Needed...
Page 255: ...Service Record 254 JT100 JT100 All Terrain Operator s Manual Service Performed Date Hours...
Page 258: ......
Page 259: ......