JT100/JT100 All Terrain Operator’s Manual
Conduct a Bore - 121
Assemble Drill String
Assemble Drill String
Prepare Beacon Housing
1.
Select nozzles (JT and AT dirt modes only) and bit.
2.
Insert nozzle into beacon housing (JT and AT dirt modes only).
3.
Attach bit (2) to beacon housing (1).
4.
Install beacon, following beacon instructions for:
•
battery replacement
•
beacon positioning
5.
Install beacon housing lid. See “Beacon Housings” on page 164.
6.
Follow beacon instructions to check beacon operation.
7.
Follow tracker instructions to calibrate beacon.
JT mode
AT dirt mode
AT mode
1.
beacon housing
2.
bit
3.
transition sub
4.
JT100 drill pipe
1.
beacon housing
2.
bit
3.
transition sub (p/n 400-1383)
4.
JT100 All Terrain drill pipe
1.
Rockmaster
®
tool
2.
bit
3.
JT100 All Terrain drill pipe
IMPORTANT:
If no part number is listed, contact your Ditch Witch
®
dealer about available options.
IMPORTANT:
A variety of nozzles and bits are available to suit your particular job conditions.
See “Downhole Tools” on page 163 for more information, or contact your Ditch Witch dealer.
j07om046c.eps
1
2
3
4
1
2
3
4
3
1
2
Summary of Contents for JT100
Page 1: ...JT100 JT100 All Terrain Tier 4 Issue 2 1 Original Instruction Operator s Manual 053 2814...
Page 105: ...Prepare 104 JT100 JT100 All Terrain Operator s Manual...
Page 247: ...Service 246 JT100 JT100 All Terrain Operator s Manual As Needed...
Page 255: ...Service Record 254 JT100 JT100 All Terrain Operator s Manual Service Performed Date Hours...
Page 258: ......
Page 259: ......