C • TTL and Relay Control
Doc. 065215-02 9/09
111
Load cycle. After 138 seconds (
Duration=138.00
), the AS40 Load cycle is
complete and the relay is opened.
Figure C-10. Example Program for AS40 Control
Relay Out 1 closed. The
AS40 Load cycle starts.
ends, Relay Out 1 opened.
When the AS40 Load cycle