MTG1000B Trunk Gateway User Manual
MTG1000B Trunk Gateway User Manual
7
Copyright @ 2011-2015 Dinstar
2
Quick Installation
2.1
Preparations before Installation
2.1.1
Attentions for Installation
The attentions for installing MTG1000B include:
To guarantee MTG1000B works normally and to lengthen the service life of the device, the humidity of the
equipment room where MTG1000B is installed should be maintained at
10%-90% (non-condensing), and
temperature should be 0
℃
~ 45
℃
;
Ensure the equipment room is well-ventilated and clean;
Power supply of MTG1000B should be
100 ~240V AC, and its socket is a three-pin socket which should be
grounded well;
Please wear
anti-static wrist strap when installing MTG1000B;
2.1.2
Preparations about Installation Site
Equipment Cabinet
Ensure the cabinet is well-ventilated and strong enough to bear the weight of MTG1000B. It’s required that
the width of the cabinet should be
482.6mm (19 inches).
IP Network
Ensure
Ethernet PBX or router under IP network has been prepared, since
MTG1000B is connected to the IP
network through the standard
10/100 network port.
Socket
Ensure the socket of MTG1000B is a three-pin socket and power supply is grounded well.
2.1.3
Installation Tools
Screwdriver
Anti-static wrist strap
Network cables, power cable, telephone wires
Hub, telephone, fax, and PBX