PPC2+™ Operation and Maintenance Manual
Page 35
©2001 DH Instruments, Inc.
When <2No> is selected from the Run Current Quick Sequence menu, the set-up/edit
routine is accessed. The first display is:
1. Entry field for sequence full scale value. Recalls
value last entered.
This entry determines the maximum pressure (furthest from zero) of the quick
pressure sequence. Enter the desired sequence maximum pressure and
press
[ENTER].
=O[_OXMO 0= W_]^ LO VO]] ^RKX ^RO Z\O]]_\O _ZZO\ VSWS^ YP ^RO M_\\OX^Vc KM^S`O
Z\O]]_\O \KXQO Y\ KX O\\Y\ aSVV YMM_\ aROX K^^OWZ^SXQ ^Y \_X ^RO ]O[_OXMO ]OO
=OM^SYX>Y\_XK]O[_OXMOSXMV_NSXQKZ\O]]_\OQ\OK^O\^RKX^ROM_\\OX^_ZZO\
VSWS^SXM\OK]O^RO_ZZO\VSWS^LOPY\O\_XXSXQ^RO]O[_OXMOY\MRKXQO^YKRSQRO\\KXQO
SPK`KSVKLVO
The next display is:
1. Entry field for sequence pressure increment in %
of full scale. Recalls last value entered.
This selection determines the size of the pressure increment in terms of % of the full
scale (FS) value entered in the previous screen. The sequence will run between zero
and full scale in pressure steps of (full scale x increment %) starting from zero and
ending with the uneven increment if applicable. Enter the desired pressure increment
and press [ENTER].
The next display is:
This selection determines the order in which the sequence increments will execute.
Selecting <1Up> will cause the sequence to execute starting at zero and going to the
full scale value.
Selecting <2Down> will cause the sequence to execute starting at the full scale value
and going to zero.
Selecting <3Both> will cause the sequence to execute from zero to full scale and
back to zero.
After making the increment order selection the
next display is:
This selection determines under what conditions, when the sequence is run, the
pressure target value will change to the next value in the sequence. If <1ENTER> is
selected, the sequence will proceed to the next target value whenever, and only
whenever, [ENTER] is pressed.
100 psi a
increment: 20 % FS
1Up 2Down 3Both
1ENTER 2Timer
Summary of Contents for PPC2+
Page 1: ... 2001 DH Instruments Inc q 9ZO K SYX KXN 7KSX OXKXMO 7KX_KV ...
Page 14: ...PPC2 Operation and Maintenance Manual 2001 DH Instruments Inc Page 6 8 89 9 ...
Page 24: ...PPC2 Operation and Maintenance Manual 2001 DH Instruments Inc Page 16 8 89 9 ...
Page 84: ...PPC2 Operation and Maintenance Manual 2001 DH Instruments Inc Page 76 8 89 9 ...
Page 132: ...PPC2 Operation and Maintenance Manual 2001 DH Instruments Inc Page 124 8 89 9 ...
Page 150: ...PPC2 Operation and Maintenance Manual 2001 DH Instruments Inc Page 142 8 89 9 ...
Page 156: ...PPC2 Operation and Maintenance Manual 2001 DH Instruments Inc Page 148 8 89 9 ...
Page 166: ...PPC2 Operation and Maintenance Manual 2001 DH Instruments Inc Page 158 8 89 9 ...