9
SITE REQUIREMENTS
Before the compressor can be properly installed, the following utilities must be supplied.
This device requires proper electrical grounding for safe operation. A licensed electrician should always complete the
electrical portion of the installation process.
WARNING
To avoid risk of electric shock, this equipment must only be connected to a supply mains with protective earth.
CAUTION
During the performance of any service procedures that may involve the disconnection of a ground wire, take extra
precautions to verify the ground wire has been properly re-connected. Never leave a ground wire disconnected, since
this can create a significant safety issue.
NOTICE
This air compressor has been designed to operate within the following voltage ranges; 115V systems, 103 to 126V AC;
230V systems, 208 to 253V AC. Failure to provide sufficient voltage to this device could result in damage to electrical
components and reduced service life.
ELECTRICAL
Follow NEC, NFPA 99C, and all local codes.
Compressors are shipped with a 6-foot electrical whip of the appropriate size for the compressor.
Qualified personnel must install a dedicated electrical circuit of sufficient capacity. See
in this manual for additional electrical information.
Any means provided to isolate this device from the supply mains shall isolate all poles simultaneously.
The disconnection means and over-current protection are to be provided by the installer (qualified electrician) in
accordance with applicable local and national electric codes. This device should always be attached to a dedicated
circuit with appropriate wiring and circuit protection. If this device is being installed as a replacement, always
have a licensed electrician inspect the existing facility electrical and complete the electrical portion of the device
installation.
PLUMBING
Attach drain tubing to fitting on bottom of coalescing filter and direct it into floor drain for proper disposal of water. If
floor drain plumbing is an issue, water can be disposed into the supplied purge bowl.
Connect compressor air outlet to facility plumbing with provided supply hose (3/8" MPT × 3/8" MPT, 6 feet in
length).
Install particulate filter to the facility shut-off valve using plumbing kit connectors provided.
Install fresh air manifold and connect fresh air intake kit supplied to external air source per NFPA 99C
recommendations.
This device should always be installed with the appropriate plumbing and fresh air intake systems. If this device
is being installed as a replacement, always have a licensed plumber inspect the existing facility plumbing and
complete the plumbing portion of the device installation.
SECTION II - PREINSTALLATION