Third Party Rack Installation Overview
Sequence of tasks.......................................................................................10
Third-party rack requirements..................................................................... 11
Organize material........................................................................................ 12
Components for EX300 systems.................................................... 12
Optional, Dell EMC PDU rail assembly installation....................................... 16
Dell EMC PDU rail and component location....................................16
Installing the EMC PDU rails...........................................................18
Installing the EMC PDU support assembly..................................... 18
Installing the PDU front tray..........................................................20
Install rails for EX300 nodes.......................................................... 20
Install rails for switches................................................................. 22
PDU, node, and switch installation
Optional, PDU component installation........................................................ 26
Installing the EMC PDU components ............................................ 27
Switch installation......................................................................... 28
Install the nodes.............................................................................32
Cabling the rack.............................................................................36
Bring the ECS system online...................................................................... 38
Upload the switch configuration files..........................................................38
Power on the nodes.................................................................................... 41
Return shipping or packing materials
Planning your lift............................................................................46
Assembling and configuring the portable lift.................................. 47
Reconfiguring the lift with Voyager kit.......................................... 48
Adjusting the arms for a frontal lift................................................ 48
Using lift on an enclosure 49" or less above the floor.................... 49
Chapter 1
Chapter 2
Chapter 3
Chapter 4
Chapter 5
Appendix A
CONTENTS
EX300
Third-Party Rack Installation Guide
3
Summary of Contents for ECS EX300
Page 1: ...ECS EX300 Third Party Rack Installation Guide 302 005 206 02 ...
Page 6: ...FIGURES 6 EX300 Third Party Rack Installation Guide ...
Page 7: ...Planning your lift 46 1 TABLES EX300 Third Party Rack Installation Guide 7 ...
Page 8: ...TABLES 8 EX300 Third Party Rack Installation Guide ...
Page 13: ...Third Party Rack Installation Overview Components for EX300 systems 13 ...
Page 14: ...Third Party Rack Installation Overview 14 EX300 Third Party Rack Installation Guide ...
Page 17: ...Figure 1 PDU component location Rail Installation Dell EMC PDU rail and component location 17 ...
Page 42: ...Bring the system online 42 EX300 Third Party Rack Installation Guide ...