4.
When testing is complete, the system self-test display shows the value 0 to
indicate that no faults were found and the system operation display shows
the progress of load operations (see Section 4.6):
LKG–5655–91I
System
self-test
display
System
operation
display
READY
LEDs lit
READY
LEDs lit
If the system self-test display shows the value 1 or 2, or if it does not
display a value, follow the procedures in Section 9.2.
Testing the Installed System 4–9
Summary of Contents for DECNIS 600
Page 16: ......
Page 18: ......
Page 24: ......
Page 34: ...2 10 Installing the DEC Network Integration Server 600...
Page 35: ...LKG 5678 91I Rack Support brackets Installing the DEC Network Integration Server 600 2 11...
Page 38: ......
Page 60: ......
Page 62: ......
Page 78: ......
Page 96: ......
Page 108: ......
Page 110: ......
Page 120: ......
Page 212: ......
Page 227: ...1 Loosen screws LKG 5688 91I 2 Remove fan tray Removing and Replacing Faulty Components 11 15...
Page 232: ...1 Loosen screws LKG 5688 91I 2 Remove fan tray 11 20 Removing and Replacing Faulty Components...
Page 260: ......
Page 262: ......
Page 270: ......
Page 282: ......
Page 284: ......
Page 288: ...V Ventilation B 2 Vents 2 7 W WAN See Wide Area Network Wide Area Network xi Index 4...