11.5.16 Final Checks
Before powering up the system make sure that:
•
All communications cables are installed correctly. Refer to the Cabling
Instructions and Specifications card for each Network Interface Card.
•
The protective cover for the power module is installed.
•
All cards are seated correctly and connected to the backplane assembly.
Removing and Replacing Faulty Components 11–47
Summary of Contents for DECNIS 600
Page 16: ......
Page 18: ......
Page 24: ......
Page 34: ...2 10 Installing the DEC Network Integration Server 600...
Page 35: ...LKG 5678 91I Rack Support brackets Installing the DEC Network Integration Server 600 2 11...
Page 38: ......
Page 60: ......
Page 62: ......
Page 78: ......
Page 96: ......
Page 108: ......
Page 110: ......
Page 120: ......
Page 212: ......
Page 227: ...1 Loosen screws LKG 5688 91I 2 Remove fan tray Removing and Replacing Faulty Components 11 15...
Page 232: ...1 Loosen screws LKG 5688 91I 2 Remove fan tray 11 20 Removing and Replacing Faulty Components...
Page 260: ......
Page 262: ......
Page 270: ......
Page 282: ......
Page 284: ......
Page 288: ...V Ventilation B 2 Vents 2 7 W WAN See Wide Area Network Wide Area Network xi Index 4...