On power up, testing takes place in the following order:
1.
The READY LEDs on the processor card and Network Interface Cards flash
on and off (one flash per second), indicating that the cards are running
module self-test:
LKG–5652–91I
Processor card
Memory card
READY LEDs
flashing
The memory card is not tested (no LEDs lit) until the processor card has
successfully completed its module self-test.
When the processor card has passed module self-test, its READY LED
remains lit and the memory card starts module self-test. The memory
card’s READY LED flashes (one flash per second) to indicate that testing is
in progress.
4–6 Testing the Installed System
Summary of Contents for DECNIS 600
Page 16: ......
Page 18: ......
Page 24: ......
Page 34: ...2 10 Installing the DEC Network Integration Server 600...
Page 35: ...LKG 5678 91I Rack Support brackets Installing the DEC Network Integration Server 600 2 11...
Page 38: ......
Page 60: ......
Page 62: ......
Page 78: ......
Page 96: ......
Page 108: ......
Page 110: ......
Page 120: ......
Page 212: ......
Page 227: ...1 Loosen screws LKG 5688 91I 2 Remove fan tray Removing and Replacing Faulty Components 11 15...
Page 232: ...1 Loosen screws LKG 5688 91I 2 Remove fan tray 11 20 Removing and Replacing Faulty Components...
Page 260: ......
Page 262: ......
Page 270: ......
Page 282: ......
Page 284: ......
Page 288: ...V Ventilation B 2 Vents 2 7 W WAN See Wide Area Network Wide Area Network xi Index 4...