2.7 What to Do Next
If your DECNIS 600 system is supplied with its Network Interface Cards
already installed, you should now:
1.
Follow the instructions on each of the Cabling Instructions and
Specifications cards provided for the Network Interface Cards. The
cards show how to install a distribution panel (if one is included as part of
the Network Interface Card kit) and attach the communications cables.
2.
Go to Section 3.9 for instructions on how to enable each Network Interface
Card and Section 3.10 for details of what to do next.
If your DECNIS 600 system does not have any Network Interface Cards
installed, go to Chapter 3 for instructions on how to install the Network
Interface Cards.
Do not power up the system until the Network Interface Cards have
been installed.
Installing the DEC Network Integration Server 600 2–13
Summary of Contents for DECNIS 600
Page 16: ......
Page 18: ......
Page 24: ......
Page 34: ...2 10 Installing the DEC Network Integration Server 600...
Page 35: ...LKG 5678 91I Rack Support brackets Installing the DEC Network Integration Server 600 2 11...
Page 38: ......
Page 60: ......
Page 62: ......
Page 78: ......
Page 96: ......
Page 108: ......
Page 110: ......
Page 120: ......
Page 212: ......
Page 227: ...1 Loosen screws LKG 5688 91I 2 Remove fan tray Removing and Replacing Faulty Components 11 15...
Page 232: ...1 Loosen screws LKG 5688 91I 2 Remove fan tray 11 20 Removing and Replacing Faulty Components...
Page 260: ......
Page 262: ......
Page 270: ......
Page 282: ......
Page 284: ......
Page 288: ...V Ventilation B 2 Vents 2 7 W WAN See Wide Area Network Wide Area Network xi Index 4...