LANcat
User Manual
Page 9-8
4.
Connect the LANcat to JACK 1 of the Calibration Standard.
(Use the supplied Category 5 Patch Cord for connecting a
Modular Jack Performance Module to the Calibration
Standard).
5.
Press START (F4) or ENTER. The message
“CALIBRATING...” will be displayed on the screen. The bar
graph across the bottom of the display will show the progress
of the calibration. Press CANCEL (F1) or ESC to cancel the
calibration procedure.
6.
After approximately 45 seconds, the LANcat will display the
message “Connect To JACK 2”. Remove the plug from
JACK 1 and insert it into JACK 2.
7.
Press CONTINUE (F4) or ENTER. The message
“CALIBRATING...” will be displayed and the bar graph
across the bottom of the display will show the progress of the
calibration. Press CANCEL (F1) or ESC to cancel the
calibration procedure.
8.
After approximately 45 seconds, the LANcat will display the
message “Connect To JACK 3”. Remove the plug from
JACK 2 and insert it into JACK 3.
9.
Press CONTINUE (F4) or ENTER. The message
“CALIBRATING...” will be displayed and the bar graph
across the bottom of the display will show the progress of the
calibration. Press CANCEL (F1) or ESC to cancel the
calibration procedure. When finished, the screen returns to the
CALIBRATE menu.
NOTE
If at any time during the above procedure an error
message is displayed on the screen, start at the
beginning of the instructions and attempt the
calibration again. If the problem continues, contact
Datacom Textron Technical Support.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com