background image

7

Vickers by Danfoss

Target-Pro 2 Analyzer and Sampler Operation Manual V-PP-MC-0002-E July 2023

C o n t i n u o u s S a m p l i n g — w i t h Ta r g e t
C l e a n l i n e s s L e v e l

This mode is similar to basic operation, except
that when a specified target cleanliness level is
achieved, the analyzer stops testing and the test
status shows Completed.

9. Follow instructions 1–5

on page 4 to select analyzer set-

tings. On the Operations screen, press [5] until
Continuous is selected.

10. Test Options—

Press [6], then press the relevant key to

switch between option selections:

1) Set minutes between tests: Press [1], enter the time
in minutes required between tests (value must be
between 1 and 30000), and press [Return].

2) Set ISO Target Level: Press [2], enter the desired
Target Cleanliness Level using the format Number/
Number/Number with any code combination
from 5 to 24, such as 10/9/5); then press [Return].

• For continuous testing until the ISO Code is achieved,
select ISO Format as described in Operating the
Analyzer, step 4. Testing will continue until all three num-
bers in the code are reached.

3) Set NAS Target Level: Press [3], enter the desired
Target Cleanliness Level as a single class number from
2 to 12, and press [Return].

For continuous testing until the NAS Class is achieved,
select NAS Format as described in Operating the
Analyzer, step 4.

Testing will continue until the class number is reached at
each of the five micron size ranges covered by NAS 1638.

4) Set logging: Press [4] once to log every test, repeat;
press [4] again to deselect logging.

Note:

If you deselect log every test, the analyzer will only

store the test results when the Target Cleanliness Level is
achieved; this reduces memory storage demands.

5) Confirm cleanliness: Press [5] once to confirm
cleanliness level, repeat; press [5] again to deselect
confirmation.

Note:

If you select Confirm Cleanliness Level, the analyzer

will repeat the sampling cycle until the target cleanliness
level is reached in two consecutive samples, and will then
display Completed status. If you choose not to confirm the
cleanliness level, the analyzer will stop, and the display will
show Completed status, after the target cleanliness level is
reached only once.

Press the flush valve pushbutton to open the valve; the
pushbutton will light up. Leave valve open for at least one
minute or 200ml of fluid; this removes trapped air and fluid
from the previous test and eliminates cross-contamination
between samples.

11. Press the flush valve

pushbutton to close the valve;

the pushbutton light will go off.

Alternate method:

Proceed to step 12—pressing

the start button [1] automatically closes the flush
valve before sampling begins.

12. Press the start button [1].

The analyzer will

begin the sampling cycles.

13.

The completion progress bar indicates test status.

14. Results

will be displayed automatically on the screen; if

auto print mode is on, results will be automatically print-
ed at the end of the emptying cycle.

15. Status

shows Waiting between tests.

16. Press the stop button

[2] at any point in the cycle to

end continuous sampling. Test status will show Idle.

Summary of Contents for Vickers Target-Pro 2

Page 1: ...Vickers by Danfoss Target Pro 2 Analyzer and Sampler Operation Manual...

Page 2: ...and Sampler Operation Manual V PP MC 0002 E July 2023 Target Pro 2 Laser Particle Analyzer User Guide September 2004 Contents Operating Precautions 2 Introduction 3 ISO Cleanliness Code 3 Target Pro 2...

Page 3: ...d using mineral oil as the operating fluid The analyzer uses the light extinction principle in which two lasers are projected through the fluid and toward photo diodes Particles that interrupt the bea...

Page 4: ...5 to program the analyzer The display will show the Operations Screen To change analyzer settings follow this sequence 1 Test Reference Press 1 enter your reference details up to 16 characters and pre...

Page 5: ...previoustest and elimi nates cross contamination between samples 8 Press the flush valve push button to close the flush valve pushbutton light goes off Alternate method Proceed to step 9 pressing the...

Page 6: ...essel vented to the atmosphere To conserve battery life connect the analyzer to the power adapter for continuous operation Continuous Sampling Basic Operation 1 Follow instructions 1 5 on page 4 to se...

Page 7: ...ogging Press 4 once to log every test repeat press 4 again to deselect logging Note If you deselect log every test the analyzer will only store the test results when the Target Cleanliness Level is ac...

Page 8: ...n appropriate solvent such as mineral spirits before taking a sample Do not use acetone Clean sample bottles and associated products following the instructions on page 13 2 Draw at least 80ml of fluid...

Page 9: ...a minimum 1 Half fill the sampling bottle with the fluid to be analyzed 2 Re cap the bottle and shake it vigorously for 30 seconds 3 Discard the fluid following current COSHH legislation 4 Repeat step...

Page 10: ...from the PC menu 6 When the transfer is complete switch the analyzer off Software Installation The internal battery can sustain 8 hours of continuous oper ation approximately 100 tests after charging...

Page 11: ...press the flush valve and see if fluid passes into the waste disposal bottle Body text Note If you suspect high water aeration levels contact Danfoss for advice Warning If excessive system contaminat...

Page 12: ...roscope counting examines the particles differently from APCs the code is given with two scale numbers only These are at 5 m and 15 m equivalent to the 6 m c and 14 m c of the APCs ISO 4406 Cleanlines...

Page 13: ...ers These relate to the use of the correct viscosity mineral fluid An even cleaner level may be needed if the operation is severe such as high frequency fluctuations in loading high temperature or hig...

Page 14: ...000 25 23 17 100 000 CorrelationbetweenParticleSizesObtainedusingACFTDandNIST CalibrationMethods Particle Size Obtained Using ACFTD SIZE ISO 4402 1991 ISOMTD NIST ISO 11171 size m m c 1 4 2 2 4 6 3 5...

Page 15: ...required by ISO 9000 QS9000 and similar quality management sys tems A procedure for determining the performance of APCs means the user can set minimum acceptablelevels Benefits include improved calib...

Page 16: ...Phone 45 7488 2222 Danfoss Power Solutions US Company 2800 East 13th Street Ames IA 50010 USA Phone 1 515 239 6000 Danfoss Power Solutions Trading Shanghai Co Ltd Building 22 No 1000 Jin Hai Rd Jin Q...

Reviews: