background image

3

Vickers by Danfoss

Target-Pro 2 Analyzer and Sampler Operation Manual V-PP-MC-0002-E July 2023

Introduction

Target-Pro 2 Analyzer

O p e r a t i o n — O n l i n e

1.

Insert the

waste fluid hose

in the

waste

disposal bottle

provided.

Important:

Do not connect the waste fluid hose to a pres-

surized system; this will cause the analyzer to malfunction
and could cause internal leakage. Discharge the waste fluid
hose into the bottle provided, or into a tank or vessel vented
to the atmosphere.

2.

Connect the

waste fluid hose

to the waste connector port

on the analyzer. Push back the quick-coupling outer ring
before connecting or disconnecting the hose end.

3.

Connect the

fluid sampling hose

to the

HP connector

on the analyzer.

4.

Connect the

fluid sampling hose

to the system using a

minimess connector; the system to be monitored must
be more than 2 bar and less than 400 bar.

5.

Press the

green button

to switch on the analyzer; the

‘Main/Test’ progress screen will be displayed.

Note:

To improve LCD screen visibility, unlatch the two

extension feet on the case bottom and tilt the case. If LCD
screen remains blank, refer to battery charging instructions.

Next Test Reference

Next Text Number Normal Test

ISO Code is

Start Stop

Print Paper Set Log

Contrast

+

-

The Target-Pro 2 measures and quantifies solid contami-
nants in hydraulic, lubrication and transmission applications.
It is designed to provide laboratory accuracy in the field,
using mineral oil as the operating fluid.

The analyzer uses the light extinction principle, in which
two lasers are projected through the fluid and toward photo
diodes. Particles that interrupt the beams reduce the light
received by the diode; their sizes are measured by changes in
condition.

Hydraulic and lubricating systems

contain metal parts that

move continuously, with hydraulic fluid as the power medium.
The fluid also creates a lubrication film to keep precision
parts separated, and serves as a cooling medium.

By their nature, hydraulic systems produce solid particulate
contaminants. When contamination exceeds set levels,
hydraulic systems can fail. A revised standard cleanliness
code, ISO 4406, classifies the numbers of particles that can
be tolerated; the Target-Pro 2 measures the levels ofthese
contaminants.

The international standard for reporting solid contaminants is
ISO 4406. This standard has been revised to incorporate the
change to ISO Medium Test Dust as the calibration
standard.

Main/Test Progress Screen

Button
1. Start—

Starts sampling and emptying cycles

2. Stop—

Stops test at any point (next test will start with

emptying cycle before new sampling cycle begins)

3. Print—

Prints a copy of test results

4. Paper—

Advances printer paper by three lines

5. Set—

Selects Operations Screen

6. Log—

Selects software options

• Transfer Log Downloads memory to software package
• Clear Log

Clears memor y

• Clear Last

Clears last result

• Recall #0

Recalls results from memor y

• Print

Prints recalled results

7. + Contrast—

Increases backlight intensity

8. – Contrast—

Reduces backlight intensity

Low Battery Indicator

Summary of Contents for Vickers Target-Pro 2

Page 1: ...Vickers by Danfoss Target Pro 2 Analyzer and Sampler Operation Manual...

Page 2: ...and Sampler Operation Manual V PP MC 0002 E July 2023 Target Pro 2 Laser Particle Analyzer User Guide September 2004 Contents Operating Precautions 2 Introduction 3 ISO Cleanliness Code 3 Target Pro 2...

Page 3: ...d using mineral oil as the operating fluid The analyzer uses the light extinction principle in which two lasers are projected through the fluid and toward photo diodes Particles that interrupt the bea...

Page 4: ...5 to program the analyzer The display will show the Operations Screen To change analyzer settings follow this sequence 1 Test Reference Press 1 enter your reference details up to 16 characters and pre...

Page 5: ...previoustest and elimi nates cross contamination between samples 8 Press the flush valve push button to close the flush valve pushbutton light goes off Alternate method Proceed to step 9 pressing the...

Page 6: ...essel vented to the atmosphere To conserve battery life connect the analyzer to the power adapter for continuous operation Continuous Sampling Basic Operation 1 Follow instructions 1 5 on page 4 to se...

Page 7: ...ogging Press 4 once to log every test repeat press 4 again to deselect logging Note If you deselect log every test the analyzer will only store the test results when the Target Cleanliness Level is ac...

Page 8: ...n appropriate solvent such as mineral spirits before taking a sample Do not use acetone Clean sample bottles and associated products following the instructions on page 13 2 Draw at least 80ml of fluid...

Page 9: ...a minimum 1 Half fill the sampling bottle with the fluid to be analyzed 2 Re cap the bottle and shake it vigorously for 30 seconds 3 Discard the fluid following current COSHH legislation 4 Repeat step...

Page 10: ...from the PC menu 6 When the transfer is complete switch the analyzer off Software Installation The internal battery can sustain 8 hours of continuous oper ation approximately 100 tests after charging...

Page 11: ...press the flush valve and see if fluid passes into the waste disposal bottle Body text Note If you suspect high water aeration levels contact Danfoss for advice Warning If excessive system contaminat...

Page 12: ...roscope counting examines the particles differently from APCs the code is given with two scale numbers only These are at 5 m and 15 m equivalent to the 6 m c and 14 m c of the APCs ISO 4406 Cleanlines...

Page 13: ...ers These relate to the use of the correct viscosity mineral fluid An even cleaner level may be needed if the operation is severe such as high frequency fluctuations in loading high temperature or hig...

Page 14: ...000 25 23 17 100 000 CorrelationbetweenParticleSizesObtainedusingACFTDandNIST CalibrationMethods Particle Size Obtained Using ACFTD SIZE ISO 4402 1991 ISOMTD NIST ISO 11171 size m m c 1 4 2 2 4 6 3 5...

Page 15: ...required by ISO 9000 QS9000 and similar quality management sys tems A procedure for determining the performance of APCs means the user can set minimum acceptablelevels Benefits include improved calib...

Page 16: ...Phone 45 7488 2222 Danfoss Power Solutions US Company 2800 East 13th Street Ames IA 50010 USA Phone 1 515 239 6000 Danfoss Power Solutions Trading Shanghai Co Ltd Building 22 No 1000 Jin Hai Rd Jin Q...

Reviews: