4
Transport and commissioning
4.1 Transport
The goods should be transported in the original packaging. During
transport, the goods must be secured safely within the packaging. All
applicable laws and regulations relating to securing loads shall be ob-
served during transport.
The machine/unit may only be unloaded and transported by means of
a forklift, a lift truck or a crane. When a crane is used for transport,
lifting gear with a sufficient length and lifting capacity has to be used.
For machine/unit weight, please refer to "Technical data" in Section 3.
WARNING!
Danger from falling loads!
Risk of injury from falling loads.
• Do not stand under suspended loads.