6.

REFRIGERANT PIPING

NOTE

All field piping must be installed by a licensed refrigeration technician 
and must comply with relevant local and national regulations.

After piping work is complete, do not under any circumstances open 
the shutoff valve until 

“7. FIELD WIRING”

 and 

“10. CHECKING OF 

DEVICE AND INSTALLATION CONDITIONS”

 are complete.

Do not use flux when brazing the refrigerant piping. Use the phosphor 
copper brazing filler metal (B-Cu93P-710/795 : ISO 3677) which does 
not require flux.
(Flux has extremely negative effect on refrigerant piping systems. For 
instance, if the chlorine based flux is used, it will cause pipe corrosion or, 
in particular, if the flux contains fluorine, it will damage the refrigerant oil.)

6-1 Selection of piping material and Refrigerant 

branching kit

Use only pipes which are clean inside and outside and which do not 
accumulate harmful sulfur, oxidants, dirt, cutting oils, moisture, or 
other contamination. (Foreign materials inside pipes including oils 
for fabrication must be 9 mg/10 ft or less.)

Use the following items for the refrigerant piping.

Material 

: Jointless phosphor-deoxidized copper pipe

Size 

: See 

“6-5 Example of connection”

 to determine the cor-

rect size.

Thickness 

: Select a thickness for the refrigerant piping which 

complies with national and local laws.

For piping work, follow the maximum tolerated length, difference in 
height, and length after a branch indicated in the “

6-5 Example of 

connection

”.

Outside unit multi connection piping kit and refrigerant branching kit 
(sold separately) are needed for connection of piping between out-
side units (in case of multi system) and piping branches.
Use only separately sold items selected specifically according to the 
outside unit multi connection piping kit, the refrigerant branching kit 
selection in the “

6-5 Example of connection

”.

6-2 Protection against contamination 

when installing pipes

Protect the piping to prevent moisture, dirt, dust, etc. from enter-
ing the piping.

NOTE

Exercise special caution to prevent dirt or dust when passing piping 
through holes in walls and when passing pipe edges to the exterior.

6-3 Pipe connection

Be sure to perform nitrogen permutation or nitrogen blow when 
brazing. 

(Refer to figure 8)

Brazing without performing nitrogen permutation or nitrogen blow 
into the piping will create large quantities of oxidized film on the 
inside of the pipes, adversely affecting valves and compressors in 
the refrigerating system and preventing normal operation.

(Refer to figure 8)

1.

Refrigerant pipe

2.

Location to be brazed

3.

Nitrogen

4.

Taping

5.

Handy valve

6.

Regulator

The pressure regulator for the nitrogen released when doing the 
brazing should be set to about 2.9 psi (Enough to feel a slight 
breeze on your cheek).

NOTE

Do not use anti-oxidants when brazing the pipe joints.
Residue can clog pipes and break equipment.

6-4 Connecting the refrigerant piping
1.

Direction to bring out the pipes
The local inter unit piping can be connected either forward or to the 
sides (taken out through the bottom) as shown in the figure 9. 
When passing out through the bottom, use the knock hole in the bot-
tom frame.

(Refer to figure 9)

1.

Left-side connection

2.

Front connection

3.

Right-side connection

Precautions when knocking out knock holes

Open knock hole (large, small) in the base frame by drilling the 4 
concave around it with a 

φ

1/4”-bit. 

(Refer to figure 10)

(Refer to figure 10)

1.

Knock hole (large : for liquid pipe, gas pipe and low side 
equalizer pipe)

2.

Knock hole (small : for high side equalizer pipe)

3.

Drill

4.

Concave section (4 points)

Be sure to avoid damaging the casing.

After knocking out the holes, we recommend you to remove any 
burrs and paint them using the repair paint to prevent rusting.

When passing electrical wiring through the knock holes, protect the wir-
ing with a conduit or bushings, making sure not to damage the wiring.

2.

Removing Pinch Piping

When connecting refrigerant piping to an outside unit, remove the 
pinch piping using the procedure in the figure 11.

(Refer to figure 11)

About handling of shutoff valves, refer to [Shutoff valve operation 
procedure] in 

“11-1 Before working”

.

CAUTION

After removing the gass, remove the pinch piping.
Any gas remaining inside may blow off the pinch piping when you 
dissolve the brazing, causing damage.

(Refer to figure 11)

1.

Pich piping (4 pieces)

2.

Do not remove the relay piping.

3.

Pinch piping

4.

Procedure 1 : Confirm the shutoff valve is closed.

5.

Procedure 2 : Connect a charge hose to the service port of 
shutoff valve and remove the gas in the pinch piping.

6.

Procedure 3 : After removing the gas in the pinch piping, dis-
solve the brazing using a burner and remove the pinch piping.

3.

Connecting refrigerant piping to outside units

Figure 12-1, 2 shows the example of connecting refrigerant piping to 
outside units.

The local inter unit piping next accesorry pipes are field supplyed.

About the detail of connecting pipes between outside units on out-
side unit multi system, refer to the “

4. Precautions when connect-

ing piping between outside units

” and the installation manual 

attached to the outside unit multi connection piping kit.

(Refer to figure 12-1)

1.

When connected to the front

2.

When connected at lateral side (bottom)

3.

Remove the shutoff valve cover to connect.

4.

Remove the knock hole on the bottom frame and route the 
piping under the bottom frame.

5.

Liquid pipe shutoff valve

6.

Low side equalizer pipe shutoff valve

7.

Gas pipe shutoff valve

8.

High side equalizer pipe shutoff valve

9.

Brazing

10.

Liquid side accessory pipe (1)

11.

Low side equalizer accessory pipe (1)

12.

Gas side accessory pipe (1)

Place

Installation period

Protection method

Outdoor

More than a month

Pinch the pipe

Less than a month

Pinch or tape the pipe

Indoor

Regardless of the period

Summary of Contents for RXYQ72PAYD

Page 1: ...ALLATION MANUAL System air conditioner English Fran ais Espa ol RXYQ72PAYD RXYQ96PAYD RXYQ108PAYD RXYQ144PAYD RXYQ168PAYD RXYQ192PAYD RXYQ72PATJ RXYQ96PATJ RXYQ108PATJ RXYQ144PATJ RXYQ168PATJ RXYQ192P...

Page 2: ...8 3 7 8 11 3 4 If installed as a single unit Pattern 1 Pattern 2 Pattern 1 Pattern 2 Pattern 3 When installed in serial 1 4 3 4 3 4 3 4 3 1 2 1 1 1 7 7 8 11 3 4 Pattern 3 2 1 60 3 1 4 2 5 2 in 40 4 0...

Page 3: ...e 19 1 2 3 5 4 6 11 12 5 8 9 6 10 13 7 7 7 7 7 1 1 1 1 5 13 1 13 2 13 3 6 2 3 4 4 C D 7 8 A 3 4 1 5 2 B 1 2 1 2 3 4 5 1 3 4 2 1 2 3 3 4 6 7 1 1 2 3 4 5 2 5 6 1 1 2 9 8 TOIN DUNIT F1 F2 TOOUT DUNIT F1...

Page 4: ...20 figure 21 figure 22 figure 24 figure 25 1 2 F1 F2 F1 F2 F1 F2 F1 F2 F1 F2 1 A1P 2 3 1 2 3 4 5 1 2 3 4 8 9 10 4 11 L1 L2 L3 12 5 6 7 1 2 3 4 5 6 7 8 9 10 12 11 1 2 3 4 5 6 7 8 9 10 13 15 15 16 F17 1...

Page 5: ...ure 31 figure 26 figure 29 figure 30 figure 32 figure 27 figure 28 1 2 1 2 3 1 2 3 4 5 1 2 2 3 5 6 4 1 2 3 4 10 13 11 5 6 7 8 9 12 15 16 17 18 14 1 2 3 4 11 12 13 9 14 10 5 6 7 8 9 15 16 17 18 19 3 4...

Page 6: ...in death or serious injury WARNING Indicates a potentially hazardous situation which if not avoided could result in death or serious injury CAUTION Indicates a potentially hazardous situation which if...

Page 7: ...at can be connected Normal operation is not possible when connected to other units Remote controller wireless kit transmitting distance can be shorter than expected in rooms with electronic fluorescen...

Page 8: ...elect an optimum kit refer to 6 REFRIGERANT PIPING Outside unit multi connection piping kit Refrigerant branching kit Make sure that any separately purchased accessories are designed for use with R410...

Page 9: ...e the rear intake grille to prevent snow from accumulating on the fins 4 INSPECTING AND HANDLING THE UNIT At delivery the package should be checked and any damage should be reported immediately to the...

Page 10: ...ants when brazing the pipe joints Residue can clog pipes and break equipment 6 4 Connecting the refrigerant piping 1 Direction to bring out the pipes The local inter unit piping can be connected eithe...

Page 11: ...manual 1 About outside unit multi connection piping kit Install the joint horizontally so that the attached warning label faces strait up and the tilt is within 15 Refer to figure 13 1 Do not install...

Page 12: ...stall the REFNET header so it splits horizontally Refer to figure 15 1 Horizontal surface 2 B arrow view Prohibited pattern Oil remains in the stopping outside unit Change to pattern 1 or pattern 2 Fr...

Page 13: ...540 ft Example 8 a b c d e o 540 ft Example 6 a b h 540 ft 8 a i j 540 ft Example 8 a i 540 ft Equivalent pipe length between outside unit 2 and indoor unit 620 ft Note 1 Assume eqivalent pipe length...

Page 14: ...unit total capacity index x 72 72 x 111 111 x Number of outside unit 2 units Connecting piping kit name BHFP22P100U Refrigerant branch kit name KHRP26M22H or KHRP26M33H KHRP26M33H KHRP26M72H Example f...

Page 15: ...iping size at 1 4 0 249 0 121 0 040 0 175 0 081 0 015 HEAT PUMP SYSTEM MODEL NAME MODEL NAME THE AMOUNT OF REFRIGERANT RXYQ72 108PAYD RXYQ72 108PATJ RXYQ144 192PAYD RXYQ144 192PATJ 2 2 lb REFRIGERANT...

Page 16: ...it with attached clamp without applying external pressure on the terminal parts terminal for power wiring terminal for transmission wiring and earth terminal If there exists the possibility of reverse...

Page 17: ...cessory clamp 1 3 Vinyl tube accessory Outside the units the transmission wiring must be finished simulta neously with the local refrigerant piping and wound with tape field supply as shown in figure...

Page 18: ...s for the airtightness test Absolutely do not open the shutoff valve until the main power ciruit insulation measurement has been completed measuring after the shutoff valve is opened will cause the in...

Page 19: ...ole with blocking material procured on site after completion of 11 ADDITIONAL REFRIGERANT CHARGE AND CHECK OPERATION Refer to figure 30 Refer to figure 26 1 Insulation material 2 Caulking etc Refer to...

Page 20: ...BS1 5 6 Lift the protruding part to open the inspection door 72PA type 96PA type 108PA type Liquid pipe shutoff valve 3 8 The 108PA type corresponds to the 1 2 diameter onsite piping using the access...

Page 21: ...ing Installation work for indoor unit 2 Calculate the additional charging amount using How to calculate the additional refrigerant to be charged in 6 5 Example of connection 3 Open the valve B See the...

Page 22: ...hecking see How to check how many units are connected in chapter 11 1 To energize the crankcase heater make sure to turn on for 6 hours before starting operation 3 It takes about 2 10 minutes for gett...

Page 23: ...There is a risk of electric shock if you touch any live parts since this operation must be performed with the power on 13 TEST RUN 13 1 Before test run Make sure the following works are completed in...

Page 24: ...t from the system Pay a special attention to the place such as a basement etc where refrigerant can stay since refrigerant is heavier than air Procedure for checking maximum concentration Check the ma...

Page 25: ...1645 Wallace Drive Suite 110 Carrollton TX 75006 info daikinac com www daikinac com 3P215731 6M EM09A060A 1002 FS...

Reviews: