Others
No.
Inspection item
Inspection content
PTI
2
nd
year
4
th
year
8
th
year
1) Sensor error inspection
2) Chart drive inspection
14
Temperature recorder
3) Recording operation inspection
inspection
4) Loose terminal
5) Chart drive dry battery inspection
6) Check of pen lifting battery
15
1) Check of wake-up battery
Electronic controller
2) LCD panel replacement
1) Speed switchover
16
Evaporator fan motor
2) Revolution direction
17
Condenser fan motor
Rotating direction
18
Evaporator fan
Deformation and damage
inspection
19
Condenser fan
Deformation and damage
inspection
Check for abnormal noise
1
and vibration during operation
2
Temperature control
1) 0˚C operation
function
2) –18˚C operation
3
Defrosting function
4
Unit water-cleaning
3-45
Electrical
system
※
The service life of the wake-up battery is approx. one year (Dry battery). For USDA transportation,
replace the battery with a new Dry battery when PTI is performed.
03̲LXE10E100以降(42-52)̲E.qx 08.8.13 7:00 PM ページ 3-45
https://daikin-p.ru