
4-2
●
Location of service ports on high pressure
and low pressure sides
Service ports on high pressure and low
pressure sides are located as shown
below.
Service port (Low pressure)
Compound gauge
Open state
Closed state
Open and closed states of gauge manifold
Gauge manifold
Passage open-
/closing cock
High-pressure
side hose
Low-pressure side hose
Coupler
(Low pressure)
Hose for air purge
and refrigerant charge
Structure of gauge manifold
Coupler
(high pressure)
Sleeve
Valve handle
A
Service port (High pressure)
Pressure gauge
(2) Removal of gauge manifold
Turn the valve handle of coupler
counterclockwise (the push pin is pulled
up). Slide the sleeve upward while fixing the
valve handle (section A) to disconnect the
quick joint from the service port.
CAUTION
Be sure to attach the cap to the
service port after the removal of the
manifold.
04̲LXE10E100以降(01-07)̲E.qx 08.8.18 8:31 AM ページ 4-2
https://daikin-p.ru