14

1

Conduit

2

Perform wiring carefully so that the wiring will not come in contact 
with the port and 

 part.

3

When routing high-voltage wiring (power supply wiring, earth 
wires, and warning/caution/run input, operation output wiring) 
from the left side

4

Connecting local piping

5

Power supply terminal block (X1M)

6

X2M terminal block for warning, caution, run input, and operation 
output

7

Earth terminal block

8

When routing high-voltage wiring (power supply wiring, earth 
wires, and warning/caution/run input, operation output wiring) 
from the right side

9

When routing high-voltage wiring (power supply wiring, earth 
wires, and warning/caution/run input, operation output wiring) 
from the front

10

When routing remote operating switch wiring from the front.

11

Remote switch terminal block (X3M)

12

When routing remote switch wiring through a wiring opening

13

Separate by at least 50 mm

14

Fixed to the rear side of the support with the provided clamp (2)

15

Perform wiring carefully so that the sound insulation of the 
compressor will not come off

16

Support

CAUTION

On completion of electrical work, check that there are no disconnected 
connectors or terminals of any electrical parts in the control box.

8. INSPECTION AND PIPE INSULATION

For piping work contractor, electrical work contractor, 
and trial run workers

• Never open the shutoff valve until the insulation measurement of 

the main power supply circuit is finished. The measured insulation 
value will become lower if the measurement is made with the 
shutoff valve opened.

• On completion of inspection and refrigerant charging, open the 

shutoff valve. The compressor will malfunction if the condensing 
unit is operated with the shutoff valve closed.

8-1 Airtight test/vacuum drying

Refrigerant is enclosed in the unit.
Be sure to keep both liquid and gas shutoff valves 
closed at the time of an airtight test or vacuum drying of 
the local piping.

[For piping work contractor]

On completion of piping work, make the following inspection precisely.

• To ensure that the condensing unit withstand pressure properly 

and prevent the penetration of foreign substances, be sure to use 
R410A-dedicated tools.

Airtight

Pressurize the high-pressure section of the system (liquid piping) 
to 3.8 MPa (38 bar) and the low-pressure section of the system 
(gas piping) to the design pressure (*1) of the indoor unit (field 
supply) from the service port (*2) (do not exceed the design 
pressure). The system is considered to have passed if there is no 
decrease in the pressure over a period of 24 hours.
If there is a decrease in the pressure, check for and repair leaks.

• Vacuum drying

Operate the vacuum pump for more than three hours from the 
service port of both the liquid pipe and the gas pipe (*2) to evacuate 
to –100.7 kPa or less. After that, (1) pressurize the outdoor unit 
with nitrogen gas to 0.2 MPa or more, and after leaving the outdoor 
unit for 10 minutes, (2) operate the vacuum pump for more than 
one hour to evacuate to –100.7 kPa or less. (Repeat the steps (1) 
and (2) three or more times.)
After the operations are completed, leave the outdoor unit for one 
hour and then check that the reading on the vacuum gauge is not 
rising. (If the reading on the vacuum gauge is rising, water may be 
remaining in the system or leakage may be occurring. In that case, 
perform necessary repair and then conduct the air-tightness test 
again.)

*1The design pressure of the indoor unit (locally procured) needs to be 

2.5 MPa or more. Contact the manufacturer in advance for 
information on the design pressure.

*2 Refer to the instruction label on the front panel of the outdoor unit 

(below) for the position of the service port.

CAUTION

• Conduct an airtight test and vacuum drying precisely through the 

service ports of both liquid and gas shutoff valves.

• Use charge hoses (provided with a pushing rod each) when using 

the service ports.

8-2 Thermal insulation work

• Be sure to perform thermal insulation of the piping after the airtight 

test and vacuum drying.

• Be sure to perform the thermal insulation of the liquid and gas 

pipes in the connecting piping. Otherwise, water leakage may 
result.

• Be sure to insulate liquid and gas connection piping. Failure to do 

so may result in water leakage. Consult the following chart as a 
general guide when selecting the insulation thickness.

Gauge manifold
Charge hose

• To ensure that the condensing unit withstand 

pressure properly and prevent the 
penetration of foreign substances (water, 
dirt, and dust), use an R410A-dedicated 
gage manifold and charge hose. 
R410A-dedicated tools and 
R407C-dedicated tools are different in screw 
specification.

Vacuum pump

• Pay the utmost attention so that the pump oil 

will not flow backward into the system while 
the pump is not in operation.

• Use a vacuum pump that can vacuum down 

to –100.7kPa (5 Torr or –755 mmHg).

Gas for airtight 
test use

• Nitrogen gas

Position of instruction label

Label

Pressure-reducing valve

Nitrogen

Used for refrigerant 
replenishment

Tank

(with siphon)

Meter

Vacuum pump

Valve

Charge 
hose

Gas side shutoff valve

Shutoff valve 
service port

Liquid side 
shutoff valve

Field pipings

Note:

Connection procedure for gauge 
manifold and vacuum pump

R410A

Outdoor unit

To indoor 
unit

Summary of Contents for LREQ5B7Y1

Page 1: ...INSTALLATION MANUAL LREQ5B7Y1 LREQ6B7Y1 LREQ8B7Y1 LREQ10B7Y1 LREQ12B7Y1 LREQ15B7Y1 LREQ20B7Y1 Air cooled refrigeration condensing unit...

Page 2: ...jennom positiv bed mmelse av B if lge Sertifikat C som det fremkommer i den Tekniske Konstruksjonsfilen D og gjennom positiv bed mmelse av E Anvendt modul F G Risikokategori H Se ogs neste side 13 jot...

Page 3: ...PS vastav k llastunud temperatuur M C Jahutusaine N Surve turvaseadme seadistus P bar Tootmisnumber ja tootmisaasta vaadake mudeli andmeplaati 21 PS K bar TS TSmin L C TSmax PS M C N P bar 22 Maksima...

Page 4: ...on manual Improper installation may result in water leakage electric shocks or fire When installing the unit in a small room take measures so that the refrigerant may not exceed the limiting concentra...

Page 5: ...ons be observed for keeping the system clean dry and tightly sealed Read the chapter 6 REFRIGERANT PIPING on page 5 carefully and follow these procedures correctly A Clean and dry Strict measures must...

Page 6: ...disturb anyone 3 The foundation is strong enough to support the weight of the unit and the floor is flat to prevent vibration and noise generation 4 The piping length between the outdoor unit and the...

Page 7: ...ary to take measures against leakage See Engineering Data for details 4 HANDLING THE UNIT 1 Decide on the transportation route 2 If a forklift is to be used pass the forklift arms through the large op...

Page 8: ...ng refrigerant piping heat exchangers Keep the following points in mind for the reuse of existing refrigerant piping heat exchangers A malfunction may result if there is deficiency Do not use the exis...

Page 9: ...oor unit H 10 m Note A trap is required at 5 m intervals from outdoor unit d1 e B d2 C c D1 F E f D2 A b a Outdoor unit Showcase Unit cooler Gas piping Liquid piping H Refrigerant piping size Unit mm...

Page 10: ...e operation manual of the dryer 6 5 Connecting the refrigerant piping CAUTION In addition to gas and liquid shutoff valves this unit has a maintenance shutoff valve see diagram below Do not operate th...

Page 11: ...dripped out in case the recovery was not complete and only then proceed with connection of the field piping 1 Service port 2 Stop valve 3 Point of pipe cutting just above brazing point or above markin...

Page 12: ...apply a screw lock agent to the screw thread Do not apply a screw lock agent for flare nut use to the sealing part Be sure to tighten the cap securely after the work Refer to Operation Method of Shuto...

Page 13: ...eriorate power factor improvement effect but also may cause capacitor abnormal heating accident due to high frequency waves Only proceed with wiring work after blocking off all power Always ground wir...

Page 14: ...eakage Be sure to connect the power wiring to the power wiring terminal block and secure it as described in 7 2 Procedure for incoming wiring on page 11 Do not connect the power supply to the terminal...

Page 15: ...EN IEC61000 3 11 1 provided that the system impedance Zsys is less than or equal to Zmax and EN IEC61000 3 12 2 provided that the short circuit power Ssc is greater than or equal to the minimum Ssc va...

Page 16: ...y the washer Otherwise the earth wire may not contact sufficiently and the earthing effect of the wire may be lost Do not finish strand wire with solder 7 4 Procedure for wiring inside units Referring...

Page 17: ...red to have passed if there is no decrease in the pressure over a period of 24 hours If there is a decrease in the pressure check for and repair leaks Vacuum drying Operate the vacuum pump for more th...

Page 18: ...of piping material on page 6 2 Make sure insulation work is done See 8 2 Thermal insulation work on page 14 3 Make sure there is no faulty refrigerant piping See 6 REFRIGERANT PIPING on page 5 9 CHEC...

Page 19: ...ling 1The cylinder s internal pressure will drop when there is little refrigerant remaining in the cylinder making it impossible to charge the unit even if the liquid shutoff valve opening is adjusted...

Page 20: ...lay The contents of a LED H2P display are as follows How to check malfunction code By operating the pushbutton switches on the PCB malfunction code items can be displayed on the condensing unit 1 Make...

Page 21: ......

Page 22: ......

Page 23: ......

Page 24: ...4PW74302 1 2012 06 Copyright 2012 Daikin 4PW74302 1 00000003...

Reviews: