Troubleshooting by Remote Controller
ESIE15-13B
172
Service Diagnosis
Troubleshooting
Caution
Be sure to turn off power switch before connect or disconnect connector, or parts damage may be occurred.
When the compressor is running,
measure the voltage b and -
of electrolytic capacitor (C+, C-).
Remove the connector for fan motor
on the PCB, and operate.
NO
NO
YES
YES
YES
YES
YES
NO
Field factors
NO
Replace the fan motor.
NO
NO
YES
Replace the fan motor.
Correct the wiring.
Replace the outdoor unit PCB.
CHECK 5
Is the power
supply voltage between
200±10% VAC?
"
U2
" is displayed?
Is the resistance valve is
above the criteria?
Is the wiring correct?
Is the
measured voltage
220 VDC or more?
Is the fan
motor normal?
(Refer to troubleshooting
"
E7
" )
Monitor the voltage
(Instantaneous voltage drop)
CHECK 5
Summary of Contents for GQI-Eco Series
Page 2: ......
Page 6: ...ESIE15 13B iv Table of Contents...
Page 14: ...Introduction ESIE15 13B xii...
Page 18: ...Outlook Outdoor Units ESIE15 13B 4 General Information 2 Outlook Outdoor Units...
Page 22: ...Operating range ESIE15 13B 8 General Information...
Page 108: ...Emergency Operation ESIE15 13B 94 Field Setting...