ESIE15-13B
Emergency Operation
Field Setting
93
Operation by the Test Operation Mode
As test run by the test operation mode, there are two methods as shown below.
<Test Operation by Wireless Remote Controller>
1. Press the Inspection / Test Operation button 4 times.
2. When you press the [ON / OFF] button after setting the test run mode, the test run starts.
<Test Operation by Outdoor Unit PCB>
1. Press the Test Operation (BS4) button on outdoor unit PCB for 5 seconds. After a while, the
test operation starts.
(Reference)
• For the initial operation after installation of the unit, forced cooling operation continues for
three minutes.
• For the second operation and afterwards after installation, the unit forcibly operates for 30
minutes in the set mode.
Normal
Test operation mode
Press the Inspection / Test
Operation button 4 times.
Summary of Contents for GQI-Eco Series
Page 2: ......
Page 6: ...ESIE15 13B iv Table of Contents...
Page 14: ...Introduction ESIE15 13B xii...
Page 18: ...Outlook Outdoor Units ESIE15 13B 4 General Information 2 Outlook Outdoor Units...
Page 22: ...Operating range ESIE15 13B 8 General Information...
Page 108: ...Emergency Operation ESIE15 13B 94 Field Setting...