2
Handover to operator and warranty
Installation and operating instructions
9
Gas Combi Unit
Floor-standing gas condensing boiler with integrated heat storage
008.1543899_02 – 04/2019 – EN
2
Handover to operator and
warranty
2.1
Instruct the owner
▪ Before you hand over the heating system, explain to the owner
how he/she can operate and check the heating system.
▪ Hand over the technical documentation (at least the operating in-
structions and operating manual) to the operator and advise him
that these documents must be made available at all times and be
stored in the immediate vicinity of the device.
▪ Document the handover by filling out the installation and instruc-
tion forms together with the owner and sign them.
2.2
Warranty conditions
The legal guarantee conditions fundamentally apply. Our more ex-
tensive warranty conditions can be found in the Internet. Ask your
suppliers if necessary.
There is only an entitlement to warranty services when it can be cer-
tified that the annual maintenance work according to
has
been regularly completed.
Summary of Contents for GCU compact Series
Page 2: ......