4
Set-up and installation
Installation and operating instructions
31
Gas Combi Unit
Floor-standing gas condensing boiler with integrated heat storage
008.1543899_02 – 04/2019 – EN
8
Guide the cables to the controller housing and remove the insu-
lation accordingly
.
Fig. 4-30
Cable guiding and strain relief
9
Effective strain relief in the controller housing by means of cable
ties must be ensured for all cables connected to the GCU com-
pact.
10
Check the holding force of the strain relief.
11
Open the front panel (
12
Insert the cables in the controller housing.
Fig. 4-31
Open the front panel, install the cabling in the controller
and establish the electrical connections
13
Lay the cabling in the controller housing (
the electrical connections on the circuit board in accordance with
Summary of Contents for GCU compact Series
Page 2: ......