List of contents
Installation and operating instructions
3
Gas Combi Unit
Floor-standing gas condensing boiler with integrated heat storage
008.1543899_02 – 04/2019 – EN
List of contents
Particular safety instructions .....................................................
Observing the instructions ..........................................
Meaning of warnings and symbols..............................
Safety instructions for installation and operation.......................
General .......................................................................
Intended use ...............................................................
Installation room..........................................................
Electrical installation ...................................................
Requirements for the heating water............................
Heating system and sanitary connection ....................
Operation ....................................................................
2 Handover to operator and warranty
Instruct the owner ......................................................................
Warranty conditions...................................................................
Design and components............................................................
GCU compact 315 / 320 (Biv) ..................................... 10
GCU compact 515 / 520 / 524 / 528 (Biv) ................... 11
Brief description.........................................................................
Dimensions and connection dimensions ...................................
Different set-ups ........................................................................
Room-air independent operation ................................ 18
Partial ambient air-independent mode ........................ 18
Ambient air-dependent mode...................................... 19
Transport and delivery...............................................................
Installing the GCU compact.......................................................
Selecting the installation site....................................... 20
Installing the device .................................................... 21
Removing the cover and thermal insulation................ 22
Air/flue gas system (LAS) ..........................................................
General instructions for the flue gas system............... 23
Connecting a flue gas line........................................... 24
Flue gas system kits ................................................... 25
Water connection ......................................................................
Connecting hydraulic lines .......................................... 28
Installation of the DB connection kit............................ 29
Installation of the P connection kit .............................. 29
Electrical connection .................................................................
Integrated heating circulation pump and 3-way valve. 33
RoCon M1 mixer module ............................................ 35
RoCon U1 room controller .......................................... 35
RoCon G1 Internet gateway ....................................... 35
Room thermostat ........................................................ 35
External switching contact .......................................... 35
Connect the gas line, check the burner setting for gas type .....
Important instructions for gas connection ................... 36
Connecting the gas line .............................................. 36
Removing/attaching the heat cell panelling ................ 36
Checking the gas presetting ........................................ 36
Filling the system........................................................................ 37
Filling the hot water heat exchanger ............................ 37
Filling the condensate siphon ...................................... 37
Filling the storage tank................................................. 37
Filling the heating system ............................................ 37
Initial commissioning .................................................................. 38
Requirements............................................................... 38
Checks before commissioning ..................................... 38
Commissioning ............................................................ 38
After commissioning..................................................... 39
Checklists for commissioning ..................................................... 40
6 Controller and electronic components
Operating elements on the boiler control panel.......................... 41
Replacing the RoCon B1 control panel ...................................... 41
Changing sensors ...................................................................... 42
Changing the storage tank temperature sensor........... 43
Design and brief description ....................................................... 44
Safety function............................................................................ 45
Burner setting ............................................................................. 45
Setting values .............................................................. 46
Establishing access to the burner ................................ 46
Checking and setting the burner .................................. 46
Setting ignition and ionisation electrodes..................... 48
Dismantling the burner ............................................................... 49
Hydraulic system connection...................................................... 51
General information regarding inspection and maintenance...... 53
Inspection and maintenance tasks ............................................. 53
Checking the connections and pipes ........................... 53
Checking the storage tank fill level .............................. 55
Check and clean the burner......................................... 55
Filling, topping up the storage tank .............................. 55
Venting the hydraulic block .......................................... 57
Troubleshooting.......................................................................... 59
Overview of possible faults......................................................... 59
Error codes ................................................................................. 61
Rectifying burner faults and STB faults ...................................... 63
Emergency operation ................................................................. 63
Temporary shutdown.................................................................. 64
Draining the storage tank............................................. 64
Draining the heating circuit and hot water circuit ......... 65
Final shutdown and disposal ...................................................... 66
Basic data................................................................................... 67
GCU compact 3xx........................................................ 67
GCU compact 5xx........................................................ 68
Summary of Contents for GCU compact Series
Page 2: ......