4
Set-up and installation
Installation and operating instructions
20
Gas Combi Unit
Floor-standing gas condensing boiler with integrated heat storage
008.1543899_02 – 04/2019 – EN
B
23
:
▪ Flue gas pipe without flow safeguard – underpressure operation
▪ Properties and application options of the flue gas pipe:
▪ Minimum requirements according to
▪ Opening for the flue gas outlet to the outside
▪ Supply air directly from the installation room (see
▪ If the dimensions of the flue gas pipe differ from those described
in these instructions (see
), a suitable calculated dimen-
sioning verification is required.
▪ For data on dimensioning, see
B
23P
:
▪ as for B
23
, but underpressure operation
B
33
:
▪ Connection of more than one device to a common flue gas system
(underpressure flue gas shaft)
▪ Vertical opening for the flue gas outlet
▪ Supply air directly from the installation room (see
▪ Suitable arithmetical dimensioning verification required because
vacuum prevails in the case of the flue gas inlet into the common
air/flue gas system.
▪ For data on dimensioning, see
▪ Parts under overpressure of the connection pipe must be conduc-
ted as a concentric pipe system.
B
53
:
▪ as for B
33
, but connection to associated flue gas pipe system in-
cluding flue gas opening
B
53P
:
▪ as for B
53
, but overpressure operation
4.3
Transport and delivery
WARNING
The GCU compact is top-heavy in the unfilled state and
could tip over during transport, which could put persons in
danger or damage the device.
▪ Secure the GCU compact well, transport carefully, use
handles.
The GCU compact is delivered on a pallet. All industrial trucks, such
as lifting trucks and forklift trucks, are suitable for transport.
Scope of delivery
▪ GCU compact (preassembled),
▪ Outside temperature sensor (RoCon OT1), for weather-com-
pensated regulation
▪ Document pack.
Fig. 4-8
Contents of bag of accessories
A
Handles (only required for transport)
B
Cover panel
C
Hose connecting piece for safety overflow
D
Assembly wrench
E
Ballcock
F
Flat gasket
G
O-ring
H
Cable tie
I
Securing clip
J
Venting hose
K
Outside temperature sensor
For additional accessories, see the price list.
4.4
Installing the GCU compact
4.4.1
Selecting the installation site
The installation site of the GCU compact must meet the minimum re-
quirements below (see also
).
Installation area
▪ The base must be level and smooth and have sufficient
ground
load-bearing capacity
of
1050 kg/m²
plus safety factor. Install a
pedestal if necessary.
▪ Observe the installation dimensions (see
Installation room
▪ There are no special conditions for ventilation of the installation
room for ambient air-independent operation (using a concentric
air/flue gas system).
▪ In partial ambient air-independent and ambient-dependent mode,
the installation room must have a ventilation opening of at least
150 cm
2
to the outside. If the flue gas line is routed to the outside
through an installation shaft, it must be rear-ventilated
(see
).
Summary of Contents for GCU compact Series
Page 2: ......