
SiBE06-514A
Outdoor Unit
Removal Procedure
153
3
Remove the sheets of
putty.
Cut the pipe with a tube
cutter.
4
Heat up the brazed part
and withdraw the piping
with pliers.
Provide a protective sheet or
a steel plate so that the
brazing flame cannot
influence peripheries.
Be careful so as not to break
the pipes by pressing it
excessively by pliers when
withdrawing it.
Step
Procedure
Points
Summary of Contents for FVKS25BVMB
Page 10: ...SiBE06 514A List of Functions 1 Part 1 List of Functions 1 List of Functions 2 ...
Page 13: ...List of Functions SiBE06 514A 4 List of Functions ...
Page 19: ...Specifications SiBE06 514A 10 Specifications ...
Page 57: ...Control Specification SiBE06 514A 48 Function and Control ...
Page 85: ...Instruction SiBE06 514A 76 System Configuration ...
Page 133: ...Check SiBE06 514A 124 Service Diagnosis ...
Page 171: ...Others SiBE06 514A 162 Others ...
Page 177: ...Wiring Diagrams SiBE06 514A 168 Appendix ...
Page 181: ...SiBE06 514A iv Index ...