![background image](http://html2.mh-extra.com/html/daikin/fua100aveb/fua100aveb_installation-manual_4703890013.webp)
English
11
4. Check that the sheet metal section of the blocking material is not protruding from the end of the lower
decoration panel.
* If the blocking material is difficult to insert, loosen the left and right screws of the lower decoration panel and
insert it. Make sure to tighten the loosened screws again after the blocking material is fixed.
(Refer to Fig.
14)
Fix the blocking material and the indoor unit tight so that no clearance remains.
If clearance remains, it may cause air leakage and condensation.
Fig. 12
Drain pan
Lower decoration panel
Insulation
Projected part
Blocking material
Projected part
Upper decoration panel
2.
1.
3.
1.
2.
Insert
1.
2.
3.
Blocking
material
Insert
Projected part
Upper decoration
panel
Insulation
Lower
decoration
panel
Insert the
bent part.
(Until you
hear a cliking
sound.)
Lift this part
slightly.
(Other side also.)
Insert
Blocking material
Bent part of
blocking material
Lower decoration
panel
Drain pan
Clearance between
lower decoration
panel and drain pan
Fig.13
Insert so that the
sheet metal section
does not protrude
from the end of the
lower decoration panel.
Fig.14
Lower decoration panel
Lower decoration panel
Screw
Screw
< Screw location of piping >
Screw
Screw
Lower decoration panel
< Screw location other than piping part >
4PEN469441-1.book Page 11 Tuesday, March 21, 2017 1:49 PM