![background image](http://html2.mh-extra.com/html/daikin/fua100aveb/fua100aveb_installation-manual_4703890030.webp)
28
English
8-5 FOR CENTRALIZED CONTROL
•
By connecting the centralized control equipment, the SkyAir series can be centrally controlled as one
group.
•
The control wiring is field supply. Prepare it by referring to table shown below.
•
For information on how to connect the centralized control equipment, refer to the operation manual and
technical guide for the centralized control equipment.
•
Connect the centralized equipment to the indoor unit connected to the remote controller.
•
Only when the centralized equipment is connected to the group that is controlled with two remote control-
lers, make the “Master” and “Slave” settings for the remote controllers.
NOTE
•
Vinyl cord with sheath or cable (Insulated thickness: 1 mm or more)
9. MOUNTING CORNER COVER · SUCTION GRILLE
For test operation without the corner cover, first refer to “11. TEST OPERATION”
•
For backward and rightward piping outlet, cut the corner cover as shown in
Fig. 47
and remove it.
(When cutting, give caution and mount on the indoor unit so that the parts for the corner cover may not fall
off.)
Wiring
Size mm²
Control wiring
Sheathed vinyl cord or cable (2 core) (NOTE)
0.75 - 1.25
Fig. 47
Piping penetrating place
Cut with saw blade.
Cut with a saw blade.
Give caution so that
it may not fall off.
Give caution so that
it may not fall off.
Piping penetrating place
For rightward piping outlet
For backward piping outlet
Corner cover
Corner cover
4PEN469441-1.book Page 28 Tuesday, March 21, 2017 1:49 PM