![background image](http://html2.mh-extra.com/html/daikin/fua100aveb/fua100aveb_installation-manual_4703890010.webp)
8
English
4. PREPARATION BEFORE INSTALLATION
(1)
Check the locations of indoor unit hanging bolts, piping outlet holes, drain piping outlet hole and
electric wirings inlet hole. (The drawing shows the view from the ceiling.)
(Refer to Fig. 5 and Fig. 6)
835 (hanging bolt pitch)
835 (hanging bolt pitch)
950
950
(unit [mm])
Gas piping
Liquid piping
Drain connection outlet
(VP20)
Fig. 5
141
88
23
88
89
140
57
120
14
120
179
105
88
171
105
88
108
141
57
132
39
198
34
89
88
Fig. 6
Locations of upward gas
piping and drain connection
Locations of backward gas
piping and drain connection
Locations of rightward gas
piping and drain connection
(unit [mm])
4PEN469441-1.book Page 8 Tuesday, March 21, 2017 1:49 PM