![background image](http://html1.mh-extra.com/html/daikin/ftks20cvmb-9/ftks20cvmb-9_service-manual_4210114182.webp)
SiENBE04-512A
Outdoor Unit / ARK(X)S-C
Removal Procedure
173
2.4
Removal of Sound Blanket
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
Remove the outer panels.
Remove the electrical
box.
1. Remove the sound
blanket.
1
Untie the strings and
open the sound blanket.
2
Lift and remove the
sound blanket (body) as
it is opened.
Since the piping ports on the
sound blanket are torn
easily, remove the blanket
carefully.
3
Lift and remove the
sound blanket (top).
S
o
u
nd
b
l
a
nket
(R
3
271)
SiENBE04-512A.book Page 173 Friday, October 5, 2007 1:49 PM
Summary of Contents for FTKS20CVMB(9)
Page 1: ...SiENBE04 512A Service Manual Inverter Pair Wall Mounted Type C Series D Series...
Page 17: ...List of Functions SiENBE04 512A 8 List of Functions...
Page 37: ...Specifications SiENBE04 512A 28 Specifications...
Page 73: ...Control Specification SiENBE04 512A 64 Function and Control...
Page 103: ...Instruction SiENBE04 512A 94 System Configuration...
Page 147: ...Check SiENBE04 512A 138 Service Diagnosis...
Page 225: ...Outdoor Unit RK X H C ARK X H C R Y N C SiENBE04 512A 216 Removal Procedure...
Page 229: ...Others SiENBE04 512A 220 Others...
Page 241: ...Wiring Diagrams SiENBE04 512A 232 Appendix...