ESIE-0303
Checking the Inputs and Outputs
3–17
3
3
4
5
1
3.5
Checking the Power Supply and Fuses
Overview
The table below contains an overview of the circuits, the voltage and their fuse codes.
Overview fuses and
overcurrent
The table below contains the used fuses and overcurrent.
Recommended fuses according to IEC standard 269-2: gL/gG (aM also admitted)
(F1U, F2U, F3U = gL/gG)
Circuit
Wiring code
Type / voltage
Fuse code
Main supply
L1 + L2 + L3 + N
3 phases / 400 V AC
F1U+F2U+F3U
Control circuit (PCBs)
TR1-prim.
1 phase / 230 V AC
F4
TR1-sec.
24 V AC
F5
Fuses +
overcurrent
EUW5KZW1
EUW8KZW1
EUW10KZW1
EUW12KZW1
EUW16KZW1
EUW20KZW1
EUW24KZW1
F1U, F2U,
F3U
3 x 16 A
3 x 20 A
3 x 25 A
3 x 32 A
3 x 40 A
3 x 50 A
3 x 50 A
F4
8 A
8 A
8 A
8 A
8 A
8 A
8 A
F5
125 mAT
125 mAT
125 mAT
125 mAT
125 mAT
125 mAT
125 mAT
F1U
5 A
5 A
5 A
5 A
5 A
5 A
5 A
F3U
315 mAT
315 mAT
315 mAT
315 mAT
315 mAT
315 mAT
315 mAT
K4S
9 A
14 A
18 A
20 A
14 A
18 A
20 A
K5S
__
__
__
__
14 A
18 A
20 A
Summary of Contents for EUWL KZW1 Series
Page 1: ......
Page 2: ......
Page 8: ...Introduction ESIE 0303 vi 3 1 4 5 ...
Page 10: ...ESIE 0303 1 2 Part 1 System Outline 3 1 1 5 ...
Page 50: ...Piping Layout ESIE 0303 1 42 Part 1 System Outline 3 1 1 4 5 ...
Page 60: ...Wiring Layout ESIE 0303 1 52 Part 1 System Outline 3 1 1 4 5 ...
Page 61: ...ESIE 0302 Wiring Layout Part 1 System Outline 1 53 3 6 Wiring Diagram Wiring diagram ...
Page 62: ...Wiring Layout ESIE 0302 1 54 Part 1 System Outline ...
Page 64: ...ESIE 0303 2 2 Part 2 Functional Description 3 1 2 5 ...
Page 84: ...ESIE 0303 3 2 Part 3 Troubleshooting 3 1 3 5 ...
Page 87: ...ESIE 0303 Inputs and Outputs Overview Part 3 Troubleshooting 3 5 3 3 4 5 1 ...
Page 88: ...Inputs and Outputs Overview ESIE 0303 3 6 Part 3 Troubleshooting 3 1 3 4 5 ...
Page 94: ...Malfunction Indications and Safeties Overview ESIE 0303 3 12 Part 3 Troubleshooting 3 1 3 4 5 ...
Page 100: ...Checking the Inputs and Outputs ESIE 0303 3 18 Part 3 Troubleshooting 3 1 3 4 5 ...
Page 112: ...Troubleshooting ESIE 0303 3 30 Part 3 Troubleshooting 3 1 3 4 5 ...
Page 114: ...ESIE 0303 4 2 Part 4 Commissioning and Test Run 3 1 4 5 ...
Page 130: ...ESIE 0303 5 2 Part 5 Maintenance 3 1 5 ...
Page 139: ...ESIE 0303 Index 3 3 4 5 1 Wiring Diagram k 1 53 ...
Page 140: ...ESIE 0303 4 Index 3 1 4 5 ...