ESIE-0303
Pre-Test Run Checks
Part 4 – Commissioning and Test Run
4–5
3
4
5
1
1.3
Water Piping Checks
Checklist
The table below contains the water piping checklist.
Water volume and
flow
The table below shows the operation range of water volume and water flow for proper operation of the
unit.
Step
Check whether...
1
A filter is installed in front of the water inlet of the plate-heat exchanger. The plate-heat
exchangers are sensitive to dirt and small particles.
2
The water volume is within the limits.
3
There is adequate water flow.
4
The water quality meets the standards.
5
The water piping is properly insulated.
6
Measurement points for temperature and pressure are available on the water circuit.
7
The flow switch and pump are properly working.
8
Air purge points are installed on the high parts of the water piping.
9
Drain taps are installed at the low points of the water piping.
10
Other parts of the water circuit are properly mounted and installed (e.g. buffer tank, expan-
sion tank...).
11
Vibration compensators are mounted at the water connections if the unit is positioned on
anti-vibration pads.
Evaporator
Condenser
Chiller type
Minimum water
volume
Minimum water
flow
Maximum water
flow
Minimum water
flow
Maximum water
flow
EUW5KZW1
62 l
19 l/min
75 l/min
24 l/min
95 l/min
EUW8KZW1
103 l
31 l/min
123 l/min
39 l/min
157 l/min
EUW10KZW1
134 l
40 l/min
161 l/min
51 l/min
203 l/min
EUW12KZW1
155 l
47 l/min
186 l/min
59 l/min
237 l/min
EUW16KZW1
205 l
62 l/min
247 l/min
79 l/min
314 l/min
EUW20KZW1
268 l
80 l/min
321 l/min
102 l/min
410 l/min
EUW24KZW1
311 l
93 l/min
373 l/min
118 l/min
474 l/min
EUWL5KZW1
62 l
17 l/min
69 l/min
__
__
EUWL8KZW1
103 l
29 l/min
115 l/min
__
__
EUWL10KZW1
134 l
38 l/min
153 l/min
__
__
EUWL12KZW1
155 l
45 l/min
179 l/min
__
__
EUWL16KZW1
205 l
57 l/min
229 l/min
__
__
EUWL20KZW1
268 l
77 l/min
307 l/min
__
__
Summary of Contents for EUWL KZW1 Series
Page 1: ......
Page 2: ......
Page 8: ...Introduction ESIE 0303 vi 3 1 4 5 ...
Page 10: ...ESIE 0303 1 2 Part 1 System Outline 3 1 1 5 ...
Page 50: ...Piping Layout ESIE 0303 1 42 Part 1 System Outline 3 1 1 4 5 ...
Page 60: ...Wiring Layout ESIE 0303 1 52 Part 1 System Outline 3 1 1 4 5 ...
Page 61: ...ESIE 0302 Wiring Layout Part 1 System Outline 1 53 3 6 Wiring Diagram Wiring diagram ...
Page 62: ...Wiring Layout ESIE 0302 1 54 Part 1 System Outline ...
Page 64: ...ESIE 0303 2 2 Part 2 Functional Description 3 1 2 5 ...
Page 84: ...ESIE 0303 3 2 Part 3 Troubleshooting 3 1 3 5 ...
Page 87: ...ESIE 0303 Inputs and Outputs Overview Part 3 Troubleshooting 3 5 3 3 4 5 1 ...
Page 88: ...Inputs and Outputs Overview ESIE 0303 3 6 Part 3 Troubleshooting 3 1 3 4 5 ...
Page 94: ...Malfunction Indications and Safeties Overview ESIE 0303 3 12 Part 3 Troubleshooting 3 1 3 4 5 ...
Page 100: ...Checking the Inputs and Outputs ESIE 0303 3 18 Part 3 Troubleshooting 3 1 3 4 5 ...
Page 112: ...Troubleshooting ESIE 0303 3 30 Part 3 Troubleshooting 3 1 3 4 5 ...
Page 114: ...ESIE 0303 4 2 Part 4 Commissioning and Test Run 3 1 4 5 ...
Page 130: ...ESIE 0303 5 2 Part 5 Maintenance 3 1 5 ...
Page 139: ...ESIE 0303 Index 3 3 4 5 1 Wiring Diagram k 1 53 ...
Page 140: ...ESIE 0303 4 Index 3 1 4 5 ...