ESIE-0303
Piping Layout
1–37
3
1
4
5
Symbols
The table below describes the symbols.
Components water
side
The table below describes the main components of the refrigeration circuit on the water side.
Symbol
Description
Symbol
Description
M1C
Compressor motor 1
Check valve
S1HP
High-pressure switch
Flare connection
R3T
Inlet water evaporator
temperature sensor
Screw connection
R4T
Freeze-up protection
Flange connection
Y1S
Liquid solenoid valve
Pinched pipe
Q1D
Discharge teperature controller
Spinned pipe
S4LP
Low-pressure switch
Field piping
No.
Component
Function / remark
a
Shut off valve
Makes it possible to shut off a part of the water
piping for maintenance (e.g. to change a filter).
b
Air purge
To purge the water circuit, to prevent air from
entering the water circuit.
c
Strainer
This strainer prevents dirt particles from entering the water
circuit, the evaporator and the condenser.
d
Flow switch
The flow switch is used to check if there is flow.
Summary of Contents for EUWL KZW1 Series
Page 1: ......
Page 2: ......
Page 8: ...Introduction ESIE 0303 vi 3 1 4 5 ...
Page 10: ...ESIE 0303 1 2 Part 1 System Outline 3 1 1 5 ...
Page 50: ...Piping Layout ESIE 0303 1 42 Part 1 System Outline 3 1 1 4 5 ...
Page 60: ...Wiring Layout ESIE 0303 1 52 Part 1 System Outline 3 1 1 4 5 ...
Page 61: ...ESIE 0302 Wiring Layout Part 1 System Outline 1 53 3 6 Wiring Diagram Wiring diagram ...
Page 62: ...Wiring Layout ESIE 0302 1 54 Part 1 System Outline ...
Page 64: ...ESIE 0303 2 2 Part 2 Functional Description 3 1 2 5 ...
Page 84: ...ESIE 0303 3 2 Part 3 Troubleshooting 3 1 3 5 ...
Page 87: ...ESIE 0303 Inputs and Outputs Overview Part 3 Troubleshooting 3 5 3 3 4 5 1 ...
Page 88: ...Inputs and Outputs Overview ESIE 0303 3 6 Part 3 Troubleshooting 3 1 3 4 5 ...
Page 94: ...Malfunction Indications and Safeties Overview ESIE 0303 3 12 Part 3 Troubleshooting 3 1 3 4 5 ...
Page 100: ...Checking the Inputs and Outputs ESIE 0303 3 18 Part 3 Troubleshooting 3 1 3 4 5 ...
Page 112: ...Troubleshooting ESIE 0303 3 30 Part 3 Troubleshooting 3 1 3 4 5 ...
Page 114: ...ESIE 0303 4 2 Part 4 Commissioning and Test Run 3 1 4 5 ...
Page 130: ...ESIE 0303 5 2 Part 5 Maintenance 3 1 5 ...
Page 139: ...ESIE 0303 Index 3 3 4 5 1 Wiring Diagram k 1 53 ...
Page 140: ...ESIE 0303 4 Index 3 1 4 5 ...