UFH screed dryout after installation of outdoor unit
If the outdoor ambient temperature and [4‑02] setting > 25°C the backup heater
will perform the screed dryout and supply the leaving water without heat pump
operation.
To program an underfloor heating screed dryout schedule
Duration and temperature
The installer can program up to 20 steps. For each step he needs to enter:
1
the duration in hours, up to 72 hours,
2
the desired leaving water temperature, up to 55°C.
Example:
t
T
A1
25°C (1)
35°C (2)
24h (1)
36h (2)
T
Desired leaving water temperature (15~55°C)
t
Duration (1~72 h)
(1)
Action step 1
(2)
Action step 2
Steps
1
Set the user permission level to
Installer
. See
124].
—
2
Go to [A.4.2]:
Commissioning
>
UFH screed dryout
>
Program
.
3
Program the schedule:
To add a new step, select the next empty line and change its
value. To delete a step and all steps below it, decrease the
duration to "–".
—
▪
Scroll through the schedule.
▪
Adjust the duration (between 1 and 72 hours) and
temperatures (between 15°C and 55°C).
4
Press the left dial to save the schedule.
To perform an underfloor heating screed dryout
INFORMATION
▪
If
Emergency
is set to
Manual
([9.5]=0), and the unit is triggered to start
emergency operation, the user interface will ask confirmation before starting.
The underfloor heating screed dryout function is active even if the user does NOT
confirm emergency operation.
▪
During underfloor heating screed dryout, pump speed limitation [9‑0D] is NOT
applicable.
Summary of Contents for EBLA04E2V3
Page 280: ...14 14 ...
Page 281: ......
Page 282: ......
Page 283: ......
Page 284: ...4P685228 1A 2022 05 Copyright 2022 Daikin Verantwortung für Energie und Umwelt ...